Construction of Additional Building of Saraswati Shishu Vidya Mandir at . Dandamukundapur.
₹9,50,000
Completed
Recommended 28 Jul 2026 · sanctioned 26 Feb 2026 · completed 28 Jul 2026
Construction of Paver Block Road from Mangalpur Kamakantia Road to the House of Padia Behera,at Kamakantia
₹8,00,000
Completed
Recommended 28 Jul 2026 · sanctioned 24 Mar 2026 · completed 28 Jul 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Jul 2026 · sanctioned 8 May 2025 · completed 28 Jul 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Jul 2026 · sanctioned 24 Sept 2025 · completed 28 Jul 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Jul 2026 · sanctioned 24 Sept 2025 · completed 28 Jul 2026
Construction of Community Centre near Mahindra Club ,Medra Sahi Penthakata
₹3,00,000
Recommended
Recommended 29 Jun 2026
Construction of Conference Hall of Odia Kudia Youth Community Center at Dasbidyadharapur
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
Construction of building for sport facilities near Chhotijodi Playground at Chhotijodi
₹7,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMON TOILETS AT KUNJESWARI
₹4,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
CONSTRUCTION OF COMMUNITY CENTER AT ANANDAPUR
₹6,00,000
Recommended
Recommended 29 Jun 2026
CONSTRUCTION OF COMMUNITY CENTER AT KHANDAYATA SAHI
₹6,00,000
Recommended
Recommended 29 Jun 2026
CONSTRUCTION OF COMMUNITY CENTER AT PARAKENA HARIJAN SAHI
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMUNITY CENTER AT SAINNTALA
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR BASUDEB MANDIR AT NARAKOLIGORADA
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR CHAITANYA MATHA AT MATHASAHI
₹5,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR CHANDI Mandir AT ATHEISA
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR JAGESWARI MANDIR AT NUASAHI
₹6,00,000
Recommended
Recommended 29 Jun 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR MAHAVEER MANDIR AT BHATAPUR
₹5,00,000
Recommended
Recommended 29 Jun 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR MANGALA MANDIR AT MAHABALAPADA Village
₹6,00,000
Recommended
Recommended 29 Jun 2026
CONSTRUCTION OF COMMUNITY CENTER NEAR MANGALA MANDIR AT TALAPATANA
₹6,00,000
Recommended
Recommended 29 Jun 2026
Construction of Community Centre at Gangadharpur
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
Construction of Community Centre near Jagabalia Club at Penthakata Puri Municipality
₹3,00,000
Recommended
Recommended 29 Jun 2026
CONSTRUCTION OF COMMUNITY CENTRE NEAR MAHAVIR TEMPLE AT BINDHAN
₹5,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF COMMUNITY MANDAP NEAR GOPINATH DEBA MATHA AT BEHENTA
₹3,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF CREMETORIUM AT ANDARSINGH PASCHIMAPARI
₹5,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
CONSTRUCTION OF KAMINI COMMUNITY CENTER NEAR MELANA PADIA AT ANDARSINGH PURBA PARI
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
CONSTRUCTION OF MAA JATIANI YOUTH COMMUNITY CENTRE PURBAPARI AT ANDARSINGH
₹5,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF MAJHISAHI YOUTH COMMUNITY CENTER AT TELENGAPADA
₹5,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
Construction of Mandap for Cultural Activities Dethipada Cricket Ground at Dethiapada
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
CONSTRUCTION OF SIREI HARIJANA SAHI COMMUNITY CENTER AT SIREI
₹4,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
Construction of Waiting Hall for Women at Balighai Chowk
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
CONSTRUCTION OF YADAV COMMUNITY CENTER AT BIRAKISHORPUR
₹3,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
CONSTRUCTION OF YADAV COMMUNITY CENTER NEAR BIJIPUR MARKET at Bijipur
₹7,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
CONTRUCTION OF KANAS CREMETORIUM NEAR BALIGHAI Chowk AT BALIGHAI
₹5,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 24 Aug 2026
Extension of Electricity supply from Gadi Sahi to Padmavati temple at Chandanpur
₹4,00,000
Recommended
Recommended 29 Jun 2026
Extension of Electricity Supply from House of Srikanta Sahu to Nadi bandha of Maa Mangala Gohari at Chandanpur
₹3,50,000
Recommended
Recommended 29 Jun 2026
Renovation of Charishree Hatapadia Pond at Charishree
₹3,00,000
Recommended
Recommended 29 Jun 2026
Renovation of Pond Guard Wall at Talla
₹6,00,000
Sanctioned
Recommended 29 Jun 2026 · sanctioned 25 Aug 2026
Construcation of Community Center at Siaro
₹3,00,000
Recommended
Recommended 19 May 2026
Construction of Community Center at Gada Bhingura
₹10,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 2 Jul 2026
Construction of Community Center at Pachaspola Harijana Sahi
₹3,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 3 Aug 2026
Construction of Community Center at Padapalli
₹3,00,000
Recommended
Recommended 19 May 2026
Construction of Community Center at Podapada
₹3,00,000
Recommended
Recommended 19 May 2026
Construction of Community Center near Sana Nilakantheswar at Dolagobindapur
₹3,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 3 Aug 2026
Construction of Community CenterNear Harihara Temple at Harihara Nagar
₹10,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 24 Aug 2026
Construction of Jagannatha Community Center at Chunadiha Ojha Sahi
₹4,00,000
Recommended
Recommended 19 May 2026
Construction of Trinatha Community Center at Nalihana
₹3,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 2 Jul 2026
Construction of Aakhandal Mani Community Center at Amuri
₹3,00,000
Recommended
Recommended 19 May 2026
Construction of Dulana Community Center at Badura Sahi
₹3,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 3 Aug 2026
Construction of Maa Sitala Community Center at Samajajapur
₹4,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 3 Aug 2026
Renovetion of Maa Jagulai Community Center at Paikapada
₹3,00,000
Sanctioned
Recommended 19 May 2026 · sanctioned 2 Jul 2026
Construction of Additional Building of Saraswati Shishu Vidya Mandir at Kanas
₹5,00,000
Completed
Recommended 7 May 2026 · sanctioned 26 Feb 2026 · completed 7 May 2026
Construction of Commmunity Centre, Harijanshahi
₹2,50,000
Completed
Recommended 7 May 2026 · sanctioned 3 Jul 2025 · completed 7 May 2026
Construction of cc road from Malisahi Khajurei Thakurani to AWC at Hakapada
₹6,00,000
Completed
Recommended 4 May 2026 · sanctioned 24 Mar 2026 · completed 4 May 2026
Consrtuction of Jagulai Community Center at Gadamurgasira
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Consrtuction of Maa Mangala Community Center at Birakishorepur
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community center Near Narayani Mandir at Bhikaripada
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Bada Jaga Community Center at Dhiha Sahi
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Barunei Community Center at Podatara
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 30 May 2026
Construction of Chhoti Budhi Community Center at Betal
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 24 Aug 2026
Construction of Community center at Nuabalia
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Alupatna
₹8,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 30 May 2026
Construction of Community Center at Bagha
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Gadi Sahi
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Harijan Sahi
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 24 Aug 2026
Construction of Community Center at Harijan Sahi
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Mangalpur
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Padhan sahi Alapur
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Rasta Upper Tulsichaura
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community Center at Sundar
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community center Near Jagulai Mandir at Odasamal
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Community center Near Jagulai Mandir at Samaghara.
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 2 Jul 2026
Construction of Community Center Near Taradevi Mandir at Nagapatana
₹4,00,000
Recommended
Recommended 19 Apr 2026
Construction of Gopinatha Community Center at Ghodahata
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 3 Aug 2026
Construction of Gopinatha Community Center at Raghurajpur
₹3,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Gopinathajiu Community Center at Nayakapatana
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Harekrushna Community Center at Banbarada
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 30 May 2026
Construction of Laxminarayan Community Center at Uttar Sahi
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 30 May 2026
Construction of Maa Dakhyaswari Community Center at Itibhuan
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 30 May 2026
Construction of Mandap at Danda
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Mandap Near Bhagabata Basudev at Gadi Patna
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Mandap Near Grameswar Mahadev at Beldal
₹10,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Radhakanta dev Kalyan Mandap at Barana
₹5,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 24 Aug 2026
Construction of Radhakrushna Community Center at Baragodia
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 27 May 2026
Construction of Renovation of Pond at Nuapada
₹5,00,000
Recommended
Recommended 19 Apr 2026
Construction of Taradevi Community Center at Dubutara
₹4,00,000
Sanctioned
Recommended 19 Apr 2026 · sanctioned 30 May 2026
Installation of Solar Light at Cremation Ground of Parakana Village.
₹40,000
Completed
Recommended 26 Mar 2026 · sanctioned 3 Jul 2025 · completed 26 Mar 2026
Installation of Solar Light at Cremation Ground of Banapur Village.
₹40,000
Completed
Recommended 18 Mar 2026 · sanctioned 3 Jul 2025 · completed 18 Mar 2026
Renovation and restoration of gopinath Commmunity Centre at Birabalabhadrapur.
₹2,50,000
Completed
Recommended 18 Mar 2026 · sanctioned 19 May 2025 · completed 18 Mar 2026
Repair and Renovation of Jatipur Community Center , Jatipur
₹2,50,000
Completed
Recommended 18 Mar 2026 · sanctioned 31 May 2025 · completed 18 Mar 2026
Repair and Renovation of Padmabati Commmunity Centre at Karadi
₹2,50,000
Completed
Recommended 18 Mar 2026 · sanctioned 31 May 2025 · completed 18 Mar 2026
Construction of Community Center at Talakanduriapada
₹3,00,000
Sanctioned
Recommended 15 Mar 2026 · sanctioned 13 May 2026
Construction of Comunity Center at Uttarsarpada
₹5,00,000
Sanctioned
Recommended 15 Mar 2026 · sanctioned 13 May 2026
Construction of Maa narayani Community center at Jamarasuan
₹3,00,000
Sanctioned
Recommended 15 Mar 2026 · sanctioned 13 May 2026
Construction of Mandap at Polangatota Melana Padia
₹5,00,000
Sanctioned
Recommended 15 Mar 2026 · sanctioned 13 May 2026
Devlopment of Park at Tulsichaura
₹6,00,000
Sanctioned
Recommended 15 Mar 2026 · sanctioned 13 May 2026
Installation of Solar Light at Cremation Ground of Alagum Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Badahat Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Balarampurgada Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Banapur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Bhimapur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Brahmanpada Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Dahan Kumbharapada Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Dasabidyadharpur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Jayrampur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Jipur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Kanjia Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Mathasahi Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Narendrapur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Panibhandar Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Parahat Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Parajapada Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Penthapada Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Phulaalasa Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Rayakhandi Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Sandhara Sasan, Bihuda Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Sinhakuda Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Sriramachandrapur Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Suanlo Village.
₹40,000
Completed
Recommended 15 Mar 2026 · sanctioned 3 Jul 2025 · completed 15 Mar 2026
Installation of Solar Light at Cremation Ground of Alanadapada Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Alish Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Bagalpur Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Balapur Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Baral Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Bastapada Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Chaudabatia Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Ketakipatna Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Madhipur Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Mahura Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Nua Someswarpur Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Puruna Budhakera Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Raichakradharpur Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Suando Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Sukal Village.
₹40,000
Completed
Recommended 13 Mar 2026 · sanctioned 3 Jul 2025 · completed 13 Mar 2026
Installation of Solar Light at Cremation Ground of Ahammadpur Village.
₹40,000
Completed
Recommended 12 Mar 2026 · sanctioned 3 Jul 2025 · completed 12 Mar 2026
Installation of Solar Light at Cremation Ground of Banbarada Village.
₹40,000
Completed
Recommended 12 Mar 2026 · sanctioned 3 Jul 2025 · completed 12 Mar 2026
Installation of Solar Light at Cremation Ground of Biraramachandrapur Village.
₹40,000
Completed
Recommended 12 Mar 2026 · sanctioned 3 Jul 2025 · completed 12 Mar 2026
Installation of Solar Light at Cremation Ground of Bidyadharpur Village.
₹40,000
Completed
Recommended 11 Mar 2026 · sanctioned 3 Jul 2025 · completed 11 Mar 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Mar 2026 · sanctioned 3 Jul 2025 · completed 6 Mar 2026
Completion of Budha Budhi Community Centre at Badheigali Markendeswar Sahi
₹5,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 13 May 2026
Completion of Budhi Maa Community Centre near Khunita Bagicha at Nilakantha Nagar
₹5,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 13 May 2026
Completion of Durga Mata Community Centre at Gandhi Nagar Sahi Penthakata
₹3,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Completion of Kalyani Mandap near Jodalinga Temple at Gada Murgasira
₹10,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construcation of Community hall at Gopalpur Village,Baliguali Gp
₹5,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 13 May 2026
Construction of Community hall near Swopneswar Temple at Laxminarayanpur
₹3,50,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Community Hall at Junupadia
₹5,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Community hall near Bankeswardev Temple at Barapada
₹5,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Community Center near Bhairabi Temple at Bidiripur
₹5,00,000
Ongoing
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of community Center near Maa Kalika Devi Temple
₹4,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Community hall at Badaharijan sahi Ankoi
₹6,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Community hall at Lohapur
₹5,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Community Hall near Maunimatha at Guru Sahi
₹5,00,000
Ongoing
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Guard Wall of Pond at Balichatar
₹5,00,000
Ongoing
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of SIDHHA SEBA Community hall at Ward no 13
₹7,00,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Construction of Toilet in Bhagabti High School at Rupaideipur
₹2,50,000
Sanctioned
Recommended 19 Feb 2026 · sanctioned 24 Mar 2026
Development of Humar Gram Panchayat Park at Gualipada
₹5,00,000
Ongoing
Recommended 19 Feb 2026 · sanctioned 26 Feb 2026
Construction of Community Center near Ghumi Thakurani Temple.
₹2,28,090
Completed
Recommended 18 Feb 2026 · sanctioned 20 May 2025 · completed 18 Feb 2026
Construction of Community Center Near Amrutaswara Temple.
₹2,36,397
Completed
Recommended 18 Feb 2026 · sanctioned 20 May 2025 · completed 18 Feb 2026
Development of Playground of Gopinath Vidyapitha , Balijaganthpur , Gomunidia GP
₹2,50,000
Completed
Recommended 13 Feb 2026 · sanctioned 3 Jul 2025 · completed 13 Feb 2026
Construction of CC Road from PWD Road to Brahmanshahi, Bjrakote
₹2,50,000
Completed
Recommended 10 Feb 2026 · sanctioned 3 Nov 2025 · completed 10 Feb 2026
Renovation of Balarampur Cultural Mandap at Balarampur Vilage , Malud GPGP
₹2,50,000
Completed
Recommended 10 Feb 2026 · sanctioned 24 Sept 2025 · completed 10 Feb 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 30 Jan 2026 · sanctioned 8 May 2025 · completed 30 Jan 2026
Construction of Community Centre near Maa Jageswari Thakurani,
₹5,00,000
Completed
Recommended 5 Jan 2026 · sanctioned 9 May 2025 · completed 5 Jan 2026
Construction of CC Road Budhiber Sansahi near pond, Budhiber
₹2,37,962
Completed
Recommended 2 Jan 2026 · sanctioned 24 Sept 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Andarsingh Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Bhatapada Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Chupuringi Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Gadamatiapada Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Kalighadi Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Nanakera Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Pandiakera Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Ranipada Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Tipuri Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Trilocchanpur Village.
₹40,000
Completed
Recommended 2 Jan 2026 · sanctioned 31 Jul 2025 · completed 2 Jan 2026
Installation of Solar Light at Cremation Ground of Dimiri Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Gadakharad Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Jagnnathpur Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Kanas Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Badalpur Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Bedhatandula Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Bindipur Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Gadabadaput Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Gadasanaput Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Gopinathpur Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Kalapadar Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Khuntiabanapur Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Nandigoda Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Sahupada Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Installation of Solar Light at Cremation Ground of Srimukundapur Village.
₹40,000
Completed
Recommended 1 Jan 2026 · sanctioned 31 Jul 2025 · completed 1 Jan 2026
Construction of Additional Building of Saraswati Shishu Vidya Mandir at Ghoda Bazar.
₹5,00,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 May 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Baku Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Gadisagoda Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Naikulapatna Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Alibada Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Alipada Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Badurabar Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Basantpur Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Deipur Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Dochhian Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Dokanda Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Gadabalabhadrapur Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Jabghar Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Jamalagoda Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Mulabasanta Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Telengapada Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Tentulimula Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Tigiria Village.
₹40,000
Completed
Recommended 31 Dec 2025 · sanctioned 31 Jul 2025 · completed 31 Dec 2025
Installation of Solar Light at Cremation Ground of Gadasahi Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Anlajodi Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Badasa Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Balipatna Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Bindhan Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Birakesharipur Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Chhotijodi Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Dibyasinghpur Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Golara Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Haladiapada Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Harashapada Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Karamala Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Kesharpur Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Khandahata Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Mandarbasta Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Nabada Village.
₹40,000
Completed
Recommended 30 Dec 2025 · sanctioned 31 Jul 2025 · completed 30 Dec 2025
Installation of Solar Light at Cremation Ground of Aswasthapari Village.
₹40,000
Completed
Recommended 29 Dec 2025 · sanctioned 31 Jul 2025 · completed 29 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 17 Dec 2025 · sanctioned 8 May 2025 · completed 17 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 12 Dec 2025 · sanctioned 8 May 2025 · completed 12 Dec 2025
Construction of Additional Building of Saraswati Shishu Vidya Mandir at Maruti Nagar,Baliguali Villege.
₹5,00,000
Sanctioned
Recommended 7 Dec 2025 · sanctioned 16 Jan 2026
Construction of CC Road from Womens College Road To Mangala Mandir at Dhoba Sahi Bagicha.
₹4,00,000
Sanctioned
Recommended 7 Dec 2025 · sanctioned 16 Jan 2026
Construction of CC Road from Water works Road to House of C Kanaka Redy at Works Road.
₹5,00,000
Sanctioned
Recommended 7 Dec 2025 · sanctioned 16 Jan 2026
Construction of Community Centre near Bipada Tarini Uanayan Parisad at Bipada Tarini Nagar, Baliguali.
₹5,00,000
Sanctioned
Recommended 7 Dec 2025 · sanctioned 16 Jan 2026
Construction of Community Hall at Udaya Nagar,Damodar Road.
₹5,00,000
Sanctioned
Recommended 7 Dec 2025 · sanctioned 16 Jan 2026
Construction of Cowshed of Govindajew Gosala at Mahabalapada, Village,Bira Ramchandrapur GP
₹9,90,000
Ongoing
Recommended 7 Dec 2025 · sanctioned 20 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Soral Light at Creamation Ground.
₹40,000
Completed
Recommended 6 Dec 2025 · sanctioned 8 May 2025 · completed 6 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 4 Dec 2025 · sanctioned 8 May 2025 · completed 4 Dec 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 24 Nov 2025 · sanctioned 19 May 2025 · completed 24 Nov 2025
Repair and Renovation of Dharmajyoti Commmunity Centre at Puruna Koronga. Bijayaramachandrapur GP
₹2,50,000
Completed
Recommended 23 Oct 2025 · sanctioned 19 May 2025 · completed 23 Oct 2025
Renovation of Bhagabat Cultural Mandap at Goudanuagaon , Goudanuagaon Vilage , Titipa GP
₹2,50,000
Completed
Recommended 22 Oct 2025 · sanctioned 3 Jul 2025 · completed 22 Oct 2025
Construction of Road Connecting Gandhi Nagar colony to NH-316 at Gandhi Nagar Pubasasan Village.
₹9,88,525
Completed
Recommended 18 Oct 2025 · sanctioned 8 May 2025 · completed 18 Oct 2025
Repair and Renovation of Khamara Commmunity Centre at Khamara.Kanheibidyadharpur GP
₹2,50,000
Completed
Recommended 18 Oct 2025 · sanctioned 19 May 2025 · completed 18 Oct 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 26 Sept 2025 · sanctioned 19 May 2025 · completed 26 Sept 2025
Installation of Solar Light at Cremation Ground of Dhol-Biranchidashapur Village.
₹40,000
Completed
Recommended 18 Sept 2025 · sanctioned 9 May 2025 · completed 18 Sept 2025
Installation of Solar Light at Cremation Ground of Kaliakera Village.
₹40,000
Completed
Recommended 18 Sept 2025 · sanctioned 9 May 2025 · completed 18 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 18 Sept 2025 · sanctioned 9 May 2025 · completed 18 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 18 Sept 2025 · sanctioned 9 May 2025 · completed 18 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 18 Sept 2025 · sanctioned 9 May 2025 · completed 18 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 17 Sept 2025 · sanctioned 9 May 2025 · completed 17 Sept 2025
Installation of Solar Light at Cremation Ground of Alasana Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Amuri Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Baliput Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Banguruba-Gadadharpur Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Barana Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Beladal Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Bira Batagaon Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Kantasila Village.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 15 Sept 2025 · sanctioned 9 May 2025 · completed 15 Sept 2025
Installation of Solar Light at Cremation Ground of Chalisibatia Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Chunadiha Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Dashagoba Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Kantasila Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Madhubanabalia Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Markandapur Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Naiguan Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Nuapada Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Odashamalla Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Palli Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Podapada Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Samangara Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Sanuan Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Siaro Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Tadasharamahansapur Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Ura Village.
₹40,000
Completed
Recommended 12 Sept 2025 · sanctioned 9 May 2025 · completed 12 Sept 2025
Installation of Solar Light at Cremation Ground of Apila Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Baliguali Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Balipatna Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of BarabodiaVillage.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Bira Pratapapur Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Charisri Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Dolagobindapur Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Ganganarayanpur Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Gopalpur Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Jamarsuan Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Nuagaon Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Talajanga Village.
₹40,000
Completed
Recommended 10 Sept 2025 · sanctioned 9 May 2025 · completed 10 Sept 2025
Installation of Solar Light at Cremation Ground of Bira Banamalipur Village.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 15 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Bira Panchamuhan Village.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Chandanpur Village.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Kapateswar Village.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Malatipatpur Village.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Raghurajpur Village.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Uttarakana Village,
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground.
₹40,000
Completed
Recommended 8 Sept 2025 · sanctioned 9 May 2025 · completed 8 Sept 2025
Installation of Solar Light at Cremation Ground of Gopinathapur Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Kanthapur Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Kasi Jagannathpur Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Khadipada Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Parbatipur Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Basudeb Ballabh Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Bira Dhaudia Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Bira Harekrushnapur Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Gunthapilipila Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Cremation Ground of Nuagaon Village.
₹40,000
Completed
Recommended 6 Sept 2025 · sanctioned 9 May 2025 · completed 6 Sept 2025
Installation of Solar Light at Creamation Ground,Dhanakera Village,Dhanakera GP
₹40,000
Completed
Recommended 5 Sept 2025 · sanctioned 31 May 2025 · completed 5 Sept 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 5 Sept 2025 · sanctioned 31 May 2025 · completed 5 Sept 2025
Installation of Solar Light at Creamation Ground,Abhayamukhi Village,Abhayamukhi GP
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 31 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground,Indupuradeuli Village, Abhayamukhi GP
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 29 Aug 2025 · sanctioned 19 May 2025 · completed 29 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 3 Jul 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 19 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.at Khelaur Village,Khelaur GP
₹40,000
Completed
Recommended 28 Aug 2025 · sanctioned 31 May 2025 · completed 28 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Installation of Solar Light at Creamation Ground.
₹40,000
Completed
Recommended 25 Aug 2025 · sanctioned 19 May 2025 · completed 25 Aug 2025
Construction of Library Hall at Delanga Vikash Parisad.
₹10,00,000
Ongoing
Recommended 22 Jul 2025 · sanctioned 13 Oct 2025
Construction of Additional Building of Saraswati Vidya Mandira at Madhuban , 1st lane , Ward.No.29
₹5,00,000
Sanctioned
Recommended 20 May 2025 · sanctioned 3 Jul 2025
Construction of Community center at Talamalisahi , Ward-24, Puri Town.
₹3,50,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Community Center near maa mangala temple.
₹4,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Community Centre near Lingaraj Kala Niketan,at Bankimuhan
₹5,00,000
Ongoing
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Additional Building of Saraswati Shishu Vidya Mandir at Panaspada
₹5,00,000
Ongoing
Recommended 11 Apr 2025 · sanctioned 20 Dec 2025
Construction of Additional Building of Saraswati Shishu Vidya Mandir at Word no 6
₹5,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 3 Jul 2025
Construction of Community Center near Shree Shree Maa Jageswari Thakurani,at Hatajodi Puri.
₹5,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Community Centre near Shree Nilachal Khandayat Mahasabha.
₹5,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Community Centre near Shree Shree Binayak Temple of Gajapati Nagar.
₹5,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Cultural Madap near Maa Tara Temple at Goudabada sahi.
₹5,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Renovetion of Sarbamangala Pathagara at Markandeswar Sahi,Puri municipality.
₹5,00,000
Sanctioned
Recommended 11 Apr 2025 · sanctioned 19 May 2025
Construction of Cultural Mandap near Baba Balunkeswar at Badalpur Village.Gadabadaput GP
₹6,00,000
Ongoing
Recommended 22 Mar 2025 · sanctioned 31 Jul 2025
Construction of CC Road from Samantrapur RD Road to Langulabandh Road
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Nov 2025
Construction of Community Center near Gopinathdev Temple at Pratap Purusottampur Village.
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 19 May 2025
Construction of Community Center Near Harchandi Mandir,at Putu Morada
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Jul 2025
Construction of Community center near Mahima Alekha Temple, (Titipa - B)
₹2,50,000
Ongoing
Recommended 22 Mar 2025 · sanctioned 8 Dec 2025
Construction of Community Centre , Gopalpur , Village-Gopalpur, Siandi GP
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Jul 2025
Construction of Community Hall Near Alandapatna Trinath Goswami House,
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Jul 2025
Development of Playground of Barada Badalpur High School at Barada Village.Gadabadaput GP
₹5,00,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 31 Jul 2025
Installation of Solar Light at Cremation Ground of Benagaon Village.
₹40,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 31 Jul 2025
Installation of Solar Light at Cremation Ground of Bhatapur Village.
₹40,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Jul 2025
Installation of Solar Light at Cremation Ground of Mulaalasa Village.
₹40,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Jul 2025
Installation of Solar Light at Cremation Ground of Sarangajodi Village.
₹40,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Jul 2025
Renovation of Brundabati Cultural Mandap at Nalitakudi , Nalitakudi Vilage , Malud GP
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 3 Nov 2025
Repair Renovation of Commmunity Centre near Gatiswar MahadevTemple at Kamasasanpur.Kerandipur GP
₹2,50,000
Ongoing
Recommended 22 Mar 2025 · sanctioned 19 May 2025
Repair and Renovation of Golapada Jagulai Commmunity Centre at Golapada.Kanheibidyadharpur GP
₹2,50,000
Ongoing
Recommended 22 Mar 2025 · sanctioned 19 May 2025
Repair and Renovation of Commmunity near Kalika thakurani Centre at Kerandipur.Kerandipur GP
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 19 May 2025
Repair and Renovation of Dakhina Sahi Bhagabata Community Centre at Hantuka
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 31 May 2025
Repair and Renovation of Sriram Commmunity Centre at Rua.Bhailipur Gp
₹2,50,000
Sanctioned
Recommended 22 Mar 2025 · sanctioned 19 May 2025
Construction Drinking Water Complex near Siddha Mahaveer Temple.
₹4,00,000
Sanctioned
Recommended 17 Mar 2025 · sanctioned 9 May 2025
Construction of Community Center.
₹5,00,000
Sanctioned
Recommended 17 Mar 2025 · sanctioned 9 May 2025
Construction of Community Toilet Complex near Siddha Mahaveer Temple.
₹7,00,000
Sanctioned
Recommended 17 Mar 2025 · sanctioned 9 May 2025
Installation of Multi- gym equipments at Guruja Jaga Panchayat Community Center at Narendrakona.
₹5,00,000
Sanctioned
Recommended 17 Mar 2025 · sanctioned 9 May 2025
Renovation of Handwash Station near Shidha Mahavir Temple Gate.
₹4,00,000
Sanctioned
Recommended 17 Mar 2025 · sanctioned 9 May 2025
Renovation of Pond near Siddha Mahaveer Temple.
₹9,50,000
Sanctioned
Recommended 17 Mar 2025 · sanctioned 9 May 2025