CONSTRUCTION CULTURAL STAGE NEAR SHIB MONDIR,UNDER JHIKADDA GP,EXECUTING AGENCY E.O.MAYURESWAR -I PANCHAYAT SAMITY.
₹4,99,353
Completed
Recommended 21 Aug 2026 · sanctioned 20 Jan 2025 · completed 21 Aug 2026
CONSTRUCTION OF CC ROAD FROM 1.SANJIT LET HOUSE TO KADAM KONAI HOUSE 2.UJJWAL SAHA HOUSE TO DARSHAN KONAI HOUSE .3.KADAM KONAI HOUSE TO SUNIL DOLUI HOUSE. UNDER BARATURIGRAM GP.EXECUTING AGENCY WILL BE ,E.O. MAYURESWAR-I PANCHAYET SAMITY.
₹9,98,477
Completed
Recommended 21 Aug 2026 · sanctioned 20 Jan 2025 · completed 21 Aug 2026
Reparing OF CC ROAD FROM RUKUNPUR KABARDANGA TO RAIL GATE ROAD VIA LUTFUL HAQUE HOUSE VIA MASJID VIAASGOR ALI HOUSE VIA JAHANARA HOUSE VIA SAMSUDDIN HOUSE VIAPIR PUKUR VIA JANAJA DANGA.EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYAT SAMITY.
₹9,97,453
Completed
Recommended 21 Aug 2026 · sanctioned 20 Jan 2025 · completed 21 Aug 2026
Construction of additional Comunity hall and concrete pever block sating in yeard near laxmi mandir at ghosh gram,under Dabuk GP.Executing Agency G.M.West Bengal Agro industries ltd,23 B.N.S.Road,kolkata 700001.
₹16,00,000
Recommended
Recommended 20 Aug 2026
Installation of Clock Tower at Labpur Fullora tola ground. Executing Agency E.O. Labpur Panchayet Samity.
₹25,00,000
Recommended
Recommended 20 Aug 2026
Construction of Bathing Ghat at bakul boro pukur under labpur -I gp ,Excuting agency E.O. LABPUR PANCHYET SAMITY.
₹2,50,000
Recommended
Recommended 5 Aug 2026
Construction of Dyning room with kitchen at FULLARA MOHAPITH,UNDER LABPUR -I GP ,EXCUTING AGENCY E.O. LABPUR PANCHAYET SAMITY.
₹10,00,000
Recommended
Recommended 5 Aug 2026
Instalation of 6 six no Solar high mast street light Rs 300000 per high mast at BAKUL KALITOLA,LABPUR BABUPARA CHOWMATHA,LABPUR RAIL UNDERPASS,KAMARPARA GROUND KURNAHAR,VIVEKANANDA SANGHA,NEAR FULLORA MANDIR.EXCUTING AGENCY WILL BE E.O LABPUR PANCHAYET SAMITY.
₹18,00,000
Recommended
Recommended 5 Aug 2026
INSTALLATION OF SOLAR SUBMERCIBLE PUMP WITH OVER HEAD TANK & PIPE LINE AT LABPUR CINEMA TOLA.EXCUTING AGENCY E.O. LABPUR PANCHAYET SAMITY.
₹2,50,000
Recommended
Recommended 5 Aug 2026
Construction of Waiting shed at Basapara Bus Stand .Executing Agency will be Nanoor Panchayet Samity.
₹10,77,575
Completed
Recommended 31 Jul 2026 · sanctioned 12 Sept 2025 · completed 31 Jul 2026
Construction of Boundary wall near kalleswar mondir pond.under Mayureswar -II.Excuting Agency will be The General Manger ,west bengal Agro Industries Corporation Ltd, 23 B.N.S ROAD 3rd floor Kolkata 700001.
₹20,00,000
Recommended
Recommended 27 Jul 2026
Installation of 3 no of high mast street light at SASTINAGAR BUS STOP,THIBA GP OFFICE,CM-II GP OFFICE Excuting Agency will be E O LABHPUR PANCHYET SAMITY
₹13,15,668
Completed
Recommended 24 Jul 2026 · sanctioned 13 Sept 2024 · completed 24 Jul 2026
Construction of CC ROAD FROM MADAN BAYEN HOUSE TO BUDHADEB HOUSE AT NADORA AND BRANCH ROAD OF MAIN ROAD AT PARULIA UNDER JHIKODDA GP ,EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹1,09,846
Completed
Recommended 23 Jul 2026 · sanctioned 5 Feb 2026 · completed 23 Jul 2026
INSTALLATION OF HIGH MAST STREET LIGHT AT JAMNA MAEKET ROAD SIDE,UNDER LABHPUR BLOCK, EXCUTING AGENCY WILL BE EO LABHPUR PANCHYAT SAMITY.
₹4,38,556
Completed
Recommended 23 Jul 2026 · sanctioned 13 Sept 2024 · completed 23 Jul 2026
Installation of submersible pump for drinking water supply at DANGORA ADIBASIPARA ,DABUK GP.EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹1,84,777
Completed
Recommended 23 Jul 2026 · sanctioned 12 Feb 2026 · completed 23 Jul 2026
installation 4 NO of high mast light at ROAD SIDE OF S N COLLEGE ,
Dwarka GP OFFICE , Sawgram melatola and KURUNAHAR MARKET .Excuting Agency will be E O LABHPUR PANCHYET SAMITY
₹17,54,225
Completed
Recommended 22 Jul 2026 · sanctioned 13 Sept 2024 · completed 22 Jul 2026
INSTALLATION 53 NO OF STREET LIGHT FROM LABPUR NITAI PAL HOUSE TO BAROGOGA.EXECUTING AGENCY WILL BE EO LABPUR PANCHAYAT SAMITY.
₹23,03,671
Completed
Recommended 22 Jul 2026 · sanctioned 27 Feb 2025 · completed 22 Jul 2026
INSTALLATION 53 NO STREET LIGHT FROM LABPUR REGISTRY OFFICE MORE TO SASTINAGAR BUS STAND,EXECUTING AGENCY WILL BE E.O.LABPUR PANCHAYT SAMITY.
₹22,98,150
Completed
Recommended 22 Jul 2026 · sanctioned 2 Dec 2024 · completed 22 Jul 2026
INSTALLATION OF 53 NO STREET LIGHT FROM LAGHATA MORE TO BAKUL VILLAGE MORE. EXECUTING AGENCY WILL BE E.O.LABPUR PANCHAYT SAMITY.
₹22,98,150
Completed
Recommended 22 Jul 2026 · sanctioned 2 Dec 2024 · completed 22 Jul 2026
Installation of LED street light (60watt)from labpur Sastinagar Bus Stop to Laghata Rail Sub-Way via Labpur New Bus Stand (Lenth 2.75km) Executing Agency will be EO LABPUR PANCHAYAT SAMITY.
₹52,15,848
Completed
Recommended 22 Jul 2026 · sanctioned 2 Dec 2024 · completed 22 Jul 2026
Construction of CC Road from MUJIBAR house to PITCH Road at Mostoli .Executing Agency E.O. LABPUR PANCHAYET SAMITY.
₹2,49,500
Completed
Recommended 21 Jul 2026 · sanctioned 13 Mar 2025 · completed 21 Jul 2026
Instalation 10 (ten)no of Highmast street light at a)DHANGORA bus stand.b)Mirbandha Masjid more.c)SAWGRAM IMAMTOLA d)MAKURA MORE e)LOHADA BUS STAND MORE f) Begsina bus stand.g)BHALAS BUS STAND h)BHAGHA MELATOLA i) karapara more j) AMNAHAR BUS STAND.Executing Agency will be E.O. LABPUR PANCHAYET SAMITY
₹48,99,510
Completed
Recommended 21 Jul 2026 · sanctioned 1 Dec 2025 · completed 21 Jul 2026
Instalation 2 no of Highmast LED street light at LAGHATA SAMSAN,EXECUTING AGENCY WILL BE E.O. LABPUR PANCHAYET SAMITY.
₹8,00,000
Completed
Recommended 21 Jul 2026 · sanctioned 6 Jan 2026 · completed 21 Jul 2026
Instalation of 2 no highmast light 16 mtrs, 1) Road side near Atul shib club ,Labpur and 2) Road side near Thakur para More, Excuting Agency E.O. LABPUR PANCHAYET SAMITY.
₹8,00,000
Completed
Recommended 21 Jul 2026 · sanctioned 18 Feb 2026 · completed 21 Jul 2026
Instalation of 6 no,16 mtr Hihgmast street light at 1.kashiara darbesh tola,2. gangarampur bus stand,3. ekut icds center,4.chowhata laxmitola more ,5.kazipara community hall,6.jamna gp office .1no 9mtr highmast street light at labpur bus stand .EXECUTING AGENCY EO LABPUR PANCHAYAT SAMITY.
₹30,23,698
Completed
Recommended 21 Jul 2026 · sanctioned 27 Feb 2025 · completed 21 Jul 2026
Installation 2 no of High Mast light ( LED Light 6x200 Watt )of 16 Mtr.at High road side near1. Ishanpur More and 2.Labpur Hospital More.Executing Agency ,E.O. LABPUR PANCHAYET SAMITY.
₹8,00,000
Completed
Recommended 21 Jul 2026 · sanctioned 17 Feb 2026 · completed 21 Jul 2026
Installation of 2 no highmast street light at TARULIA MORE AND IAHANPUR DHARMARAJTOLA,EXECUTING AGENCY WILL BE E.O. LABPUR PANCHAYET SAMITY.
₹8,00,000
Completed
Recommended 21 Jul 2026 · sanctioned 10 Oct 2025 · completed 21 Jul 2026
Installation of highmast street light at 1. paschimpara icds,2.paschimkadipur shibtola,3. jadablal foot ball ground 4.saspur bus stand,5.donaipur kalitola.executing agency EO LABPUR PANCHAYAT SAMITY.
₹22,69,773
Completed
Recommended 21 Jul 2026 · sanctioned 27 Feb 2025 · completed 21 Jul 2026
Installation of HIGHMAST STREET LIGHT OF 16 Mtr at road side of UTTARPARA MORE .EXECUTING AGENCY WILL BE E.O. LABPUR PANCHAYET SAMITY.
₹5,00,000
Completed
Recommended 21 Jul 2026 · sanctioned 31 Dec 2025 · completed 21 Jul 2026
Construction of Community hall at kotasur, near Madaneswar shib Mandir.under Mayureswar Assembly.Executing Agency will be THE GENERAL MANAGER, WEST BENGAL AGRO INDUSTRIES CORPORATION LTD,23 B.N.S. ROAD,3RD FLOOR,KOLKATA 70000.1
₹30,00,000
Recommended
Recommended 20 Jul 2026
INSTALLATION OF ONE HIGHMAST LIGHT AT NAWTARA MORE.EXECUTING AGENCY ,E.O LABPUR PANCHAYET SAMITY.
₹4,00,000
Completed
Recommended 30 Mar 2026 · sanctioned 11 Mar 2026 · completed 30 Mar 2026
INSTALLATION OF ONE HIGHMAST LIGHT,AT INDUS DSAPARA MORE OF ROAD SIDE.EXECUTING AGENCY WILL BE E.O. LABPUR PANCHAYET SAMITY.
₹4,00,000
Sanctioned
Recommended 6 Mar 2026 · sanctioned 23 Jul 2026
Construction of CC DRAIN from SUKUR HOUSE TO AZU HOUSE at papuri under Charkolgram GP ,EXECUTING AGENCY will be E.O. NANOOR PANCHAYET SAMITY.
₹19,57,096
Completed
Recommended 12 Feb 2026 · sanctioned 29 Jan 2026 · completed 12 Feb 2026
Installation of 2 NO HIGHMAST STREET LIGHT AT PAPURI NEAR VUNDU HOUSE AND 2 NO NEAR MUZIBAR HOUSE , 2 NO ALAI HOUSE AT KHALA VILLAGE.EXECUTING AGENCY WILL BE E.O.NANOOR PANCHAYET SAMITY.
₹17,63,427
Completed
Recommended 12 Feb 2026 · sanctioned 4 Dec 2025 · completed 12 Feb 2026
Construction of kitchen room at Adityapur J.B. School, Bolpur Birbhum W.B. PIN 731204.Executing Agency WILL BE B.D.O.BOLPUR SRINIKETAN BLOCK.
₹3,23,503
Completed
Recommended 3 Feb 2026 · sanctioned 22 Jul 2025 · completed 3 Feb 2026
Construction of Gallery at S D S A Stadium ,BOLPUR ,BIRBHUM .Executing Agency E .O . BOLPUR MUNICIPALITY.
₹89,83,692
Sanctioned
Recommended 2 Feb 2026 · sanctioned 10 Mar 2026
Installation of 40 no street light from NITAI BARI gate to JANUKUNDU HATUGARA ASHRAM.EXCUTING AGENCY WILL BE E.O.T.R.D.A ,BIRBHUM.
₹22,00,000
Recommended
Recommended 16 Jan 2026
CONSTRUCTION OF 2 NO CLASS ROOM AT SUDHAMOYEE JUNIOR BESIC SCHOOL, UNDER BILOPUR MUNICIPALITY.EXECUTING AGENCY WILL BE E.O. S S D A, BOLPUR.
₹16,00,000
Sanctioned
Recommended 31 Dec 2025 · sanctioned 10 Mar 2026
CONSTRUCTION OF 2NO CLASS ROOM AT NANOOR CM HIGH SCHOOL.EXECUTING AGENCY WILL BE EO NANOOR PANCHAYAT SAMITY.
₹14,97,628
Completed
Recommended 31 Dec 2025 · sanctioned 28 Feb 2025 · completed 31 Dec 2025
Construction of boundary wall, Cultural Stage and renovation of Class Room of SRINANDA HIGH SCHOOL at JAMBUNI,BOLPUR .Executing Agency Will BE E.O. S S D A ,BOLPUR .
₹39,61,373
Sanctioned
Recommended 28 Dec 2025 · sanctioned 12 Feb 2026
Construction of sanaskriti Carcha kendra at Modian Bayenpara under mollarpur GP ,EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹3,00,000
Sanctioned
Recommended 26 Dec 2025 · sanctioned 5 Feb 2026
CONSTRUCTION OF WORK SHED AT SWAGRAM COMUNITY HALL, DWARKA GP ,EXECUTING AGENCY WILL BE E.O. LABPUR PANCHAYET SAMITY.
₹2,49,825
Completed
Recommended 19 Dec 2025 · sanctioned 16 Sept 2025 · completed 19 Dec 2025
CONSTRUCTION OF ADDITIONAL WORK OF POLICE COMMUNITY HALL AT PRANTIK UNDER BIOPUR SRINIKETAN DEVELOPMENT BLOCK .EXECUTING AGENCY WILL BE E.O. BOLPUR- SRINIKETAN PANCHAYET SAMITY.
₹11,00,000
Sanctioned
Recommended 3 Dec 2025 · sanctioned 21 Aug 2026
Construction of C C ROAD FROM DOMPARA KALITOLA TO MAJARIPARA GHAT . EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹3,50,000
Sanctioned
Recommended 3 Dec 2025 · sanctioned 5 Feb 2026
Construction of C C ROAD FROM SANAT SARKAR LAND TO NABAKUMAR BAGDI AT DEURYPARA. EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹2,50,000
Sanctioned
Recommended 3 Dec 2025 · sanctioned 5 Feb 2026
Construction of CC ROAD from DABUK ADIBASHI PRIMARY SCHOOL TO ANGAN BARI KENDRA AT ADIBASHIPARA .EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹4,00,000
Sanctioned
Recommended 3 Dec 2025 · sanctioned 5 Feb 2026
Construction of concreet culvert near Souvik Ghosal House at Mohula under kanach GP. executing agency will be E.O.MAYURESWAR -I PANCHAYET SAMITY.
₹1,30,000
Sanctioned
Recommended 3 Dec 2025 · sanctioned 5 Feb 2026
Construction of TRAFFIC KIOSK FOR BOLPUR POLICE STATION AT GHEROPARA .EXECUTING AGENCY WILL BE E.O. BOLPUR -SRINIKETAN PANCHAYET SAMITY.
₹1,10,000
Sanctioned
Recommended 3 Dec 2025 · sanctioned 21 Aug 2026
Construction 4(four)no of rooms AT CHARKOLGRAM HIGH SCHOOL.Executing Agency will be E.O. NANOOR PANCHAYET SAMITY.
₹47,04,000
Sanctioned
Recommended 26 Nov 2025 · sanctioned 29 Jan 2026
Construction OF 1(one)no room at PALITA HIGH SCHOOL ,Executing Agency will be NANOOR PANCHAYET SAMITY.
₹11,76,000
Sanctioned
Recommended 26 Nov 2025 · sanctioned 29 Jan 2026
Construction of pilgrim shade near joydev guest house ,under joydev kenduli GP Executing agency E.O. SSDA,BOLPUR W.B.
₹3,49,316
Completed
Recommended 25 Nov 2025 · sanctioned 30 Apr 2025 · completed 25 Nov 2025
Construction of Boundary Wall for TANAYENDAR Vidyalaya at GOALPARA Village, Executing Agency will be EO SRINIKETAN SANTINIKETAN DEVELOPMENT AUTHORITY,BOLPUR,BIRBHUM.W.B.
₹37,20,542
Completed
Recommended 24 Nov 2025 · sanctioned 30 Oct 2024 · completed 24 Nov 2025
Construction of CC Road at 1. Paschimpara idgaha to sk Sajal house via Raficul Islam house.2. Abdul Hakim House to Sardar ALI Shop and Ajmal Haque house at METEKONA VILL UNDER ILLAMBAZAR BLOCK ,Executing Agency will be E.O. SSDA,Bolpur, BIBHUM W.B.
₹43,58,180
Completed
Recommended 24 Nov 2025 · sanctioned 30 Apr 2025 · completed 24 Nov 2025
Installation of CCTV cameras and other allied materials at Bolpur town area ,area under the jurisdiction of Bolpur police station.EXECUTING AGENCY WILL BE E.O. S.S.D.A .BOLPUR, BIRBHUM .W.B.
₹42,90,487
Completed
Recommended 24 Nov 2025 · sanctioned 7 Mar 2025 · completed 24 Nov 2025
RENOVATION OF OLD SCHOOL BUILDING OF SAILABALA GIRLS HIGH SCHOOL,UNDER 11 NO WORD BOLPUR MUNICIPALITY,EXECUTING AGENCY WILL BE EO SSDA BOLPUR ,BIRBHUM .
₹28,99,420
Completed
Recommended 24 Nov 2025 · sanctioned 16 Dec 2024 · completed 24 Nov 2025
construction work at GHURISHA SRIPUR HIGH SCHOOL, UNDER ILLAMBAZAR BLOCK ,EXECUTING AGENCY WILL BE E.O.SSDA, BOLPUR ,BIRBHUM.
₹35,32,487
Completed
Recommended 21 Nov 2025 · sanctioned 16 Dec 2024 · completed 21 Nov 2025
CONSTRUCTION WORK OF SCHOOL BUILDING OF BOLPUR GIRLS JrBASIC SCHOOL,UNDER 8 NO WORD ,BOLPUR MUNICIPALITY.EXECUTING AGENCY WILL BE E.O. SSDA BOLPUR ,BIRBHUM.
₹23,05,148
Completed
Recommended 21 Nov 2025 · sanctioned 16 Dec 2024 · completed 21 Nov 2025
construction and beauitifitation of PAPURI COMMUNITY HALL under charkolgram G.P. EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹19,60,000
Ongoing
Recommended 20 Nov 2025 · sanctioned 29 Jan 2026
INSTALLATION OF 11 (ELEVEN) 16 Mtr HIGHMAST LIGHT ON HIGH ROAD AT 1.near GATTOR UTTAR PARA CLUB.2.SWAGRAM INDRATOLA MORE,3.MOHULA SHIBTOLA,4.KALYANPUR PRIMARI SCHOOL,5.SARAPARAJPUR MORE,6.SHITALGRAM SHIBTOLA MORE,7.KAICHARA SHIBTOLA MORE,8.MALOTIPUR DHARMARAJTOLA,9. SRIKRISHNAPUR KANDAR GHAT,10. INDAS DASPARA,11.LAGOSHA PRIMARYSCHOOL NO I. EXECUTING AGENCY WILL BE E.O. LABPUR PANCHAYET SAMITY.
₹54,99,446
Completed
Recommended 11 Nov 2025 · sanctioned 8 Oct 2025 · completed 11 Nov 2025
CONSTRUCTION OF CC ROAD FROM CHARKALGRAM GP OFFICE TO POST OFFICE, EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹19,59,120
Completed
Recommended 30 Oct 2025 · sanctioned 12 Sept 2025 · completed 30 Oct 2025
CONSTRUCTION OF KITCHEN,DINING SHED ,TOILET AT PAPURI PRIMARY SCHOOL AT CHARKALGRAM GP.EXECUTING AGENCY WILL BE EO NANOOR PANCHAYET SAMITY.
₹8,19,002
Completed
Recommended 18 Oct 2025 · sanctioned 28 Feb 2025 · completed 18 Oct 2025
Construction of Cover drain Bishu shop to Talar Par at PAPURI vill under Charkolgram GP , Executing Agency will be E.O.NANOOR Panchayet Samity.
₹15,99,252
Completed
Recommended 13 Oct 2025 · sanctioned 5 May 2025 · completed 13 Oct 2025
CONSTRUCTION OF CC ROAD FROM CM SCHOOL PLY GROUND TO MUSLIM PARA,EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹4,89,699
Completed
Recommended 25 Sept 2025 · sanctioned 12 Sept 2025 · completed 25 Sept 2025
Installation 60 NO of LED Street Light from ABADANGA GP OFFICE TO BUNIADANGA,1.5 KM ,Executing agency will be E.O.LABPUR Panchayet Samity.
₹25,90,262
Completed
Recommended 12 Sept 2025 · sanctioned 29 May 2025 · completed 12 Sept 2025
CONSTRUCTION OF 2 NO CLASS ROOM AT BHEPURA HIGH SCHOOL NAWANAGAR KADDA GP .EXECUTING AGENCY EO NANOOR PANCHAYAT SAMITY.
₹18,97,587
Completed
Recommended 25 Aug 2025 · sanctioned 7 Mar 2025 · completed 25 Aug 2025
Construction of CC Road fromYakub Khan house to Canal par at Papuri Village under Charkalgram GP, Executing Agency will be E.O. Nanoor Panchayet SAMITY.
₹19,98,592
Completed
Recommended 25 Aug 2025 · sanctioned 5 May 2025 · completed 25 Aug 2025
Construction of Kitchen at swagram community hall .Executing Agency E.O. LABPUR PANCHAYET SAMITY.
₹2,99,970
Completed
Recommended 13 Aug 2025 · sanctioned 10 Jul 2025 · completed 13 Aug 2025
Construction 2 no of TOILET at Swagram community hall .Executing Agency E.O. LABPUR PANCHAYET SAMITY.
₹3,49,965
Completed
Recommended 12 Aug 2025 · sanctioned 10 Jul 2025 · completed 12 Aug 2025
Construction of concrete pavment drainage work including drinking water facility at sawgram community hall, Executing Agency E.O. LABPUR PANCHAYET SAMITY.
₹6,99,930
Completed
Recommended 12 Aug 2025 · sanctioned 10 Jul 2025 · completed 12 Aug 2025
INSTALLATION EQUIPMENT AT COMPUTER LAB OF CHANDI DAS MAHABIDYALAYA,KHUJUTIPARA ,KADDA GP .EXECUTING AGENCY EO NANOOR PANCHAYAT SAMITY.
₹8,99,970
Completed
Recommended 29 Jul 2025 · sanctioned 28 Mar 2025 · completed 29 Jul 2025
CONSTRUCTION OF WAITING SHED FOR PATIENT AT NANOOR BPHC.EXECUTING WILL BE EO NANOOR PANCHAYAT SAMITY.
₹6,93,993
Completed
Recommended 26 Jul 2025 · sanctioned 7 Mar 2025 · completed 26 Jul 2025
Installation of highmast street light 1.Tantbandhi Busstand more,2. Khaerbuni Dharmaraj tola more,3.Bhalas Durgatola more, 4. Layekpur shibtola more,5.Haranandapur more,6. Chowhatta Masjid more,7. Paschimpara Masjid more, 8. Patharghata more,.9.Moeashpur Bus stand,Executing Agency will be E.O. Labpur Panchayet Samity.
₹41,75,711
Completed
Recommended 25 Jul 2025 · sanctioned 16 May 2025 · completed 25 Jul 2025
Installation of HighMast street lihgt ai 1.Brahmanpara,Benepara more.2.Kadoa Bus Stand.3.Gobindapur Bus stand.4.Bunia Bus stand.5.Murugram Shibtola More .6Darbarpur More.7.Raipur Tematha .8.Fullora more.Executing Agency E.O. LABPUR PANCHAYET SAMITY.
₹37,11,481
Completed
Recommended 25 Jul 2025 · sanctioned 16 May 2025 · completed 25 Jul 2025
Construction of PCC Road from Charkolgram high school to Poultry Farm under Charkolgram GP,Executing Agency will be E.O. NANOOR Panchayet Samity.
₹49,97,955
Completed
Recommended 1 Jul 2025 · sanctioned 5 May 2025 · completed 1 Jul 2025
Installation of high mast light at somsha,Executing Agency wil be EO sainthia panchayet samity.
₹4,82,916
Completed
Recommended 26 Jun 2025 · sanctioned 13 Nov 2024 · completed 26 Jun 2025
RENOVATION OF ROAD AT NANOOR BLOCK OFFICE, EXECUTING AGENCY WILL BE EO NANOOR PANCHAYET SAMITY.
₹9,96,655
Completed
Recommended 24 Jun 2025 · sanctioned 28 Mar 2025 · completed 24 Jun 2025
CONSTRUCTION OF CC COVER DRAIN FROM BABU HOUSE TO HATSERANDI AT CHARKALGRAM GP .EXECUTING AGENCY WILL BE E.O.NANOOR PANCHYAT SAMITY .
₹15,97,860
Completed
Recommended 9 Jun 2025 · sanctioned 5 May 2025 · completed 9 Jun 2025
CONSTRUCTION OF CC ROAD FROM ABBASUDDIN HOUSE TO PITCH ROAD AT MOSTOLI.EXECUTING AGENCY WILL EO LABPUR PANCHAYET SAMITY.
₹3,99,200
Completed
Recommended 26 May 2025 · sanctioned 27 Feb 2025 · completed 26 May 2025
CONSTRUCTION OF CC COVER DRAIN FROM NEPAL DAS HOUSE TO SAHEB METE HOUSE AT JUBUTIA . EXECUTING AGENCY WILL BE EO NANOOR PANCHAYET SAMITY
₹7,97,819
Completed
Recommended 20 May 2025 · sanctioned 28 Feb 2025 · completed 20 May 2025
INSTALLATION OF SUB MERCIBLE PUMP WITH PIPE LINE FOR DRINKING WATER AT SONACHITURIA.EXECUTING AGENCY WILL BE EO LABPUR PANCHAYET SAMITY.
₹3,99,960
Completed
Recommended 20 May 2025 · sanctioned 27 Feb 2025 · completed 20 May 2025
Installation 10(ten) no 16 mtr Highmast street light at 1. Buniadanga more 2. Abadanga bus stand.3. Kurumba sibtola more.4. Mandira-Majpara more.5.Kapsundi Masjid more.6.Dangal high school more.7.Balarampur tematha more.8.langalhata bus stand.9.Laghosa Masjid more. 10. Bisoypur bus stand.Executing Agency will be E.O. LABPUR PANCHAYET SAMITY
₹46,49,010
Completed
Recommended 11 May 2025 · sanctioned 13 Mar 2025 · completed 11 May 2025
Installation 12 no 16 mtr highmast street light at1. Hatkalua bazar.2. Choto goga masjid more.3.Bakul burikali more.4.Rakerswar shibtola more.5.Bhola bazar bus stand.6.Dhondanga monshatola more.7.Bamnigram bus stand.8.Maheshpur kalitola more.9.Kotoghosa more.10.Swagram Pashimpara Baro masjid more.11. KAMAR MATH TEMATHA MORE .12 KURUNAHAR BUS STAND.EXECUTING AGENCY E.O. LABPUR PANCHAYET SAMITY.
₹55,78,935
Completed
Recommended 11 May 2025 · sanctioned 13 Mar 2025 · completed 11 May 2025
INSTALATION OF ONE NO GENERATOR AT NANOOR BPHC UNDER NANOOR CHANDIDAS GP ,EXECUTING AGENCY WILL BE EO NANOOR PANCHAYAT SAMITY.
₹8,99,500
Completed
Recommended 25 Apr 2025 · sanctioned 28 Mar 2025 · completed 25 Apr 2025
INSTALATION OF 2 NO HIGHMAST STREET LIGHT NEAR PAPURI MASJID CHARKOLGRAM GP. EXECUTING AGENCY EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 23 Apr 2025 · sanctioned 13 Mar 2025 · completed 23 Apr 2025
INSTALATION OF 2 NO OF HIGHMAST STREET LIGHT AT TALA CHARKOLGRAM GP .EXECUTING AGENCY EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 23 Apr 2025 · sanctioned 13 Mar 2025 · completed 23 Apr 2025
Construction of 2 no class room at Makrampur Hrijon pally primary school,word no 10 under BOLPUR Municipality,Executing Agency wiil be E.O. S.S.D A.BOLPUR.
₹15,88,043
Sanctioned
Recommended 17 Apr 2025 · sanctioned 7 May 2025
REPAIRING OF CC ROAD FROM ATAINAGAR MATHPARA TO DWARKA SIBTOLA.EXECUTING AGENCY WILL BE EO LABPUR PANCHAYET SAMITY.
₹19,00,188
Completed
Recommended 8 Apr 2025 · sanctioned 27 Feb 2025 · completed 8 Apr 2025
CONSTRUCTION OF CC ROAD FROM SADHU SHOPE TO IDGAH,UNDER PANCSOYA GP ,EXECUTING AGENCY WILL BE E.O. BOLPUR SRINIKETAN PANCHAYET SAMITY.
₹6,00,000
Completed
Recommended 2 Apr 2025 · sanctioned 6 Jan 2025 · completed 2 Apr 2025
Electrical installation at Harijan Praimary School and Sudhamoyee besic school under word no 10and 7 under bolpur municipality,Executing Agency will be E.O. SSDA BOLPUR.
₹4,64,136
Sanctioned
Recommended 26 Mar 2025 · sanctioned 5 May 2025
Construction of CC Road from Somnath house to Basudev house at Daspara Daskhalgram under Dashkhalgram I GP , Executing Agency will be EO Nanoor Panchayat Samity
₹4,98,627
Completed
Recommended 25 Mar 2025 · sanctioned 6 Jan 2025 · completed 25 Mar 2025
HIGH MAST LIGHT INSTALLTION AT NOWAPARA. EXECUTING AGENCY WILL BE EO SAINTHIA PANCHAYET SAMITY.
₹4,83,060
Completed
Recommended 20 Mar 2025 · sanctioned 13 Nov 2024 · completed 20 Mar 2025
Installation high mast street light at konarpur, Executing Agency will be EO sainthia panchyet samity
₹4,83,060
Completed
Recommended 20 Mar 2025 · sanctioned 13 Nov 2024 · completed 20 Mar 2025
INSTALLATION OF HIGH MAST STREET LIGHT AT PANRUI BAZAR UNDER SAINTHIA PANCHYET SAMITY AND EXECUTING AGENCY WILL BE E.O. SAINTHIA PANCHYET SAMITY.
₹4,80,941
Completed
Recommended 20 Mar 2025 · sanctioned 13 Nov 2024 · completed 20 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT BERGRAM HIGH SCHOOL ,EXECUTING AGENCY WILL BE E.O.BOLPUR SRINIKETAN PANCHAYAT SAMITY.
₹2,88,758
Completed
Recommended 19 Mar 2025 · sanctioned 6 Jan 2025 · completed 19 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT KESABPUR MIRZAPARA EXECUTING AGENCY WILL BE E.O. BOLPUR -SRINIKETAN PANCHAYAT SAMITY.
₹2,89,514
Completed
Recommended 19 Mar 2025 · sanctioned 6 Jan 2025 · completed 19 Mar 2025
Development of Adayasakti park at Bolpur Municipality ward no20.Executing Agency E.O.SSDA,
₹30,60,311
Sanctioned
Recommended 14 Mar 2025 · sanctioned 30 Apr 2025
CONSTRUCTION OF CC ROAD ,FROM KOPAI CABIN TO KISHAN DIGHIR PAR UNDER ALBANDHA GP,EXECUTING AGENCY WILL BE E.O. BOLPUR SRINIKETAN PANCHAYET SAMITY.
₹5,96,657
Completed
Recommended 13 Mar 2025 · sanctioned 14 Jan 2025 · completed 13 Mar 2025
Construction Gallery shed at SDSA STADIUM under jurisdiction of Bolpur Municipality,Executing Agency will be E.O . SSDA ,BOLPUR.
₹34,54,681
Sanctioned
Recommended 11 Mar 2025 · sanctioned 30 Apr 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT DAMDAMA.EXECUTING AGENCY WILL BE E.O. BOLPUR SRINIKETAN PANCHAYAT SAMITY.
₹2,89,543
Completed
Recommended 10 Mar 2025 · sanctioned 6 Jan 2025 · completed 10 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT DHARMATA BUS STAND, EXECUTING AGENCY WILL BE E.O.BOLPUR SRINIKETAN PANCHAYAT SAMITY.
₹2,89,543
Completed
Recommended 10 Mar 2025 · sanctioned 6 Jan 2025 · completed 10 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT GOBINDAPUR ,EXECUTING AGENCY WILL BE E.O. BOLPUR PANCHAYAT SAMITY.
₹2,88,787
Completed
Recommended 10 Mar 2025 · sanctioned 14 Jan 2025 · completed 10 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT SUKHBAZAR,EXECUTING AGENCY WILL BE E.O.BOLPUR SRINIKETAN PANCHAYAT SAMITY.
₹2,89,831
Completed
Recommended 10 Mar 2025 · sanctioned 14 Jan 2025 · completed 10 Mar 2025
CONSTRUCTION AND REPAIR OF CC ROAD, FROM NAJRUL PRIMARY SCHOOL TO PWD ROAD NEAR BADHAN MOLLA HOUSE ,EXECUTING AGENCY WILL BE E.O. BOLPUR SRINIKETAN PANCHAYET SAMITY.
₹5,98,859
Completed
Recommended 7 Mar 2025 · sanctioned 6 Jan 2025 · completed 7 Mar 2025
CONSTRUCTION OF CC ROAD FROM JUMMAN MIA HOUSE TO AKBAR MIA HOUSE UNDER MULUK GP, EXECUTING AGENCY WILL BE E.O. BOLPUR SRINIKETAN PANCHAYET SAMITY.
₹6,97,215
Completed
Recommended 7 Mar 2025 · sanctioned 6 Jan 2025 · completed 7 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT BAHIRI HATTOLA ,EXECUTING AGENCY WILL BE E.O.BOLPUR SRINIKETAN PANCHAYAT SAMITY.
₹2,89,744
Completed
Recommended 7 Mar 2025 · sanctioned 6 Jan 2025 · completed 7 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT KONKALITOLA,EXECUTING AGENCY WILL BE E.O. BOLPUR-SRINIKETAN PANCHAYAET SAMITY.
₹2,89,744
Completed
Recommended 7 Mar 2025 · sanctioned 6 Jan 2025 · completed 7 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT KONKALITOLA,EXECUTING AGENCY WILL BE E.O. BOLPUR-SRINIKETAN PANCHAYAET SAMITY.
₹2,89,744
Completed
Recommended 7 Mar 2025 · sanctioned 6 Jan 2025 · completed 7 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT MADHAYA KHARA ,EXECUTING AGENCY WILL BE E.O. BOLPUR -SRINIKETAN PANCHAYAT SAMITY.
₹2,89,744
Completed
Recommended 7 Mar 2025 · sanctioned 6 Jan 2025 · completed 7 Mar 2025
INSTALLATION OF HIGHMAST STREET LIGHT AT SINGHI PURBOPARA BUS STAND .EXECUTING AGENCY WILL BE E.O BOLPUR SRINIKETAN PANCHAYAT SAMITY.
₹2,89,744
Completed
Recommended 7 Mar 2025 · sanctioned 14 Jan 2025 · completed 7 Mar 2025
INSTALLATION OF HIGHMAST STRRET LIGHT AT GIDHA ,EXECUTING AGENCY WILL BE E.O. BOLPUR -SRINIKETAN PANCHAYAT SAMITY.
₹2,88,700
Completed
Recommended 7 Mar 2025 · sanctioned 14 Jan 2025 · completed 7 Mar 2025
Construction of main gate at PURNIDEVI COWDHURY GIRLS COLLEGE.EXECUTING AGENCY E.O. S.S.D.A. BOLPUR BIRBHUM.
₹8,79,190
Sanctioned
Recommended 5 Mar 2025 · sanctioned 30 Apr 2025
Construction of skill development centre at ILLAMBAZAR BLOCK DEV PREMISE.E.O. SSDA ,BOLPUR .W.B.
₹11,19,454
Sanctioned
Recommended 5 Mar 2025 · sanctioned 30 Apr 2025
Construction of CC ROAD FROM KHAIRUL BASAR HOUSE TO SIRAJUL SK HOUSE,UNDER KANKALI TOLA GP,EXCUTING AGENCY WILL BE E.O. BOLPUR SRINIKETAN PANCHAYET SAMITY.
₹4,96,832
Completed
Recommended 4 Mar 2025 · sanctioned 6 Jan 2025 · completed 4 Mar 2025
CONSTRUCTION OF CC ROAD FROM AROZ SK HOUSE TO MILON SK HOUSE UNDER KIRNAHAR I GP, EXECUTING AGENCY WILL BE E.O . NANOOR PANCHAYET SAMITY.
₹4,98,707
Completed
Recommended 3 Mar 2025 · sanctioned 6 Dec 2024 · completed 3 Mar 2025
Construction of CC ROAD FROM FARING HOUSE TO CHARKALGRAM HIGH SCHOOL AT KHALA.EXECUTING AGENCY WILL BE ,EO NANOOR PANCHAYAT SAMITI.
₹50,23,131
Completed
Recommended 3 Mar 2025 · sanctioned 2 Dec 2024 · completed 3 Mar 2025
CONSTRUCTION OF CC ROAD FROM JINNA SK TO ASAI SK HOUSE UNDER JALANDI GP ,EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹4,98,105
Completed
Recommended 3 Mar 2025 · sanctioned 6 Dec 2024 · completed 3 Mar 2025
CONSTRUCTION OF CC ROAD FROM LAL SK HOUSE TO PAL PUKUR PAR, UNDER KIRNAHAR II GP,EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY .
₹4,99,479
Completed
Recommended 3 Mar 2025 · sanctioned 6 Dec 2024 · completed 3 Mar 2025
CONSTRUCTION OF CC ROAD FROM MOROL PUKUR PAR TO KOCHI SK HOUSE UNDER THUPSARA GP EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹4,98,587
Completed
Recommended 3 Mar 2025 · sanctioned 6 Dec 2024 · completed 3 Mar 2025
CONSTRUCTION OF CC ROAD FROM PARIMAL MUKHERJEE HOUSE TO KADAMTALA,UNDER KADDA GP ,EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹4,98,452
Completed
Recommended 3 Mar 2025 · sanctioned 6 Dec 2024 · completed 3 Mar 2025
Construction of concrete drain from MUKTI MONDAL house to KANTI MONDAL house. at khala, Executing Agency will be EO NANOOR PANCHATY SAMITI.
₹10,24,370
Completed
Recommended 3 Mar 2025 · sanctioned 2 Dec 2024 · completed 3 Mar 2025
Installation 2 no highmast light under DASKHAL GRAM GP, Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Installation 2 no of highmast light under kirnahar -I ,Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Installation 2 no of highmast street light UNDER kirnahar -II.Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Installation 2 no of highmast street light under jalandi GP,Executing AGENCY will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Installation 2 no of highmast street light under UCHKARAN GP. Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Installation 2 no of hihgmast light under THUPSARA GP ,Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Installation 2no highmast street light at NAWANAGAR KADDA, EXCUTING AGENCY WILL BE ,EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 3 Mar 2025 · sanctioned 12 Dec 2024 · completed 3 Mar 2025
Construction CC road from Budu sk house to Dighirpar Kabarsthan at SAKULIPUR VILLAGE, UNDER CHANDIDAS NANOOR GP,EXECUTING AGENCY WILL BE EO NANOOR PANCHAYAT SAMITY.
₹4,98,811
Completed
Recommended 28 Feb 2025 · sanctioned 6 Jan 2025 · completed 28 Feb 2025
Construction CC Road from Sukur sk house to Momin sk house via Eidgha moidan at PAPURI VILLAGE under Charkalgram GP , Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹9,99,598
Completed
Recommended 28 Feb 2025 · sanctioned 6 Jan 2025 · completed 28 Feb 2025
Construction of cc road from majhi pukur to Dhopabandhi par at Angora village, under uchkaron GP Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹4,98,811
Completed
Recommended 28 Feb 2025 · sanctioned 6 Jan 2025 · completed 28 Feb 2025
Construction of CC Road from Prokash hazra house to Sukumar Hazra houseat Palsa village under Daskhalgram II GP ,Executing Agency will be EO NANOOR PANCHAYET SAMITY.
₹4,98,805
Completed
Recommended 28 Feb 2025 · sanctioned 6 Jan 2025 · completed 28 Feb 2025
Installation 2 no of highmast light under DASKHAL GRAM -II GP,Executing Agency will be EO NANOOR PANCHAYAT SAMITY
₹5,78,914
Completed
Recommended 28 Feb 2025 · sanctioned 12 Dec 2024 · completed 28 Feb 2025
HIGH MAST LIGHT AT AHAMADPUR PURATAN HATTALA.EXECUTING AGENCY WILL BE EO SAINTHIA PANCHAYET SAMITY
₹4,81,037
Completed
Recommended 27 Feb 2025 · sanctioned 13 Nov 2024 · completed 27 Feb 2025
Installation of high mast street light at sahispur ,Executing Agency will be EO sainthia panchayet samity.
₹4,81,037
Completed
Recommended 21 Feb 2025 · sanctioned 13 Nov 2024 · completed 21 Feb 2025
CONSTRUCTION OF CC ROAD FROM SHYAMA THANDAR HOUSE TO GUTUNI PAR, UNDER BARA SAOTA GP ,EXECUTING AGENCY WILL BE E.O. NANOOR PANCHAYET SAMITY.
₹4,98,230
Completed
Recommended 22 Jan 2025 · sanctioned 6 Dec 2024 · completed 22 Jan 2025
CONSTRUCTION OF CHEMBER OF H.M. O. AT NANOOR B.P.H.C. EXECUTING AGENCY WILL BE EO NANOOR PANCHAYAT SAMITY.
₹3,49,000
Ongoing
Recommended 22 Jan 2025 · sanctioned 28 Feb 2025
Installation 2 no of highmast street light under chandidas nanoor gp.Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 22 Jan 2025 · sanctioned 12 Dec 2024 · completed 22 Jan 2025
Installation 2 no of highmast street light under bara saota gp.Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹5,78,914
Completed
Recommended 15 Jan 2025 · sanctioned 12 Dec 2024 · completed 15 Jan 2025
Installation 4 no highmast light at PAPURI,KHALA AND CHARKALGRAM, Executing Agency will be EO NANOOR PANCHAYAT SAMITY.
₹11,57,828
Completed
Recommended 15 Jan 2025 · sanctioned 12 Dec 2024 · completed 15 Jan 2025
CONSTRUCTION OF CC ROAD FROM SK NAJRU HOUSE TO SANTU KHAN HOUSE UNDER KASBA GP ,EXECUTING AGENCY WILL BE E.O BOLPUR SRINIKETAN PANCHAYET SAMITY.
₹5,00,000
Sanctioned
Recommended 11 Nov 2024 · sanctioned 6 Jan 2025
CONSTRUCTION OF FOOT PATH AND PARTITION WALL 0F DIGHIPUKUR AT PEPULGRAM UNDER DAKHINGRAM GP ,EXECUTING AGENCY WILL BE E.O. MAYURESWAR -I PANCHAYET SAMITY.
₹15,00,000
Sanctioned
Recommended 23 Oct 2024 · sanctioned 6 Feb 2026
Construction of boundary wall and gate at mayureswar girls high school. Executing Agency will be EO Mayureswar -II Panchayat Samity.
₹5,00,000
Ongoing
Recommended 27 Sept 2024 · sanctioned 14 Jan 2025
Construction of BOUNDARY WALL at NOAPARA HEALTH CENTER. Executing will be EO Mayureswar-II Panchayat samity.
₹5,00,000
Ongoing
Recommended 27 Sept 2024 · sanctioned 14 Jan 2025
Construction of Boundary Wall at Sukhbazar Eco PARK UNDER ,ILLAMBAZAR BLOCK ,Executing Agency will be EO S.S.D.A. BOLPUR, BIRBHUM.
₹41,24,451
Sanctioned
Recommended 27 Sept 2024 · sanctioned 6 Dec 2024
Construction of boundary wall with main gate at LOKPARA MAHAVIDYALAYA.Excuting Agency will be EO Mayureswar -II Panchayat Samity.
₹15,00,000
Ongoing
Recommended 27 Sept 2024 · sanctioned 14 Jan 2025
Construction of extention building AT CHOTOTURIGRAM MADRASHA SCHOOL .Executing agency will be EO Mayureswar-II Panchayat samity.
₹5,00,000
Ongoing
Recommended 27 Sept 2024 · sanctioned 14 Jan 2025