Construction of CC Drain from Ganipur Nayaner Chara Soshan Kali Bari To Green Field City Gate. (70 mtr)
₹2,99,646
Completed
Recommended 21 Aug 2026 · sanctioned 9 Dec 2024 · completed 21 Aug 2026
Construction of CC New Road at 4No Pole From H/O Uma Sankar Shaw To H/O Ashok Mondal Tample.(22 mtr)
₹79,609
Completed
Recommended 21 Aug 2026 · sanctioned 9 Dec 2024 · completed 21 Aug 2026
Construction of CC Road & Drain With Cover Slab From H/O Narayan Manna to Maa Sitala Mandir At Akra Ferry Ghat Road. (50 mtr)
₹1,99,909
Completed
Recommended 21 Aug 2026 · sanctioned 28 Nov 2024 · completed 21 Aug 2026
Construction of CC Road from H/O Akkas Ali Molla to H/O Soidul Haqe Molla.(69 mtr)
₹2,99,815
Completed
Recommended 21 Aug 2026 · sanctioned 28 Nov 2024 · completed 21 Aug 2026
Construction of CC Road From H/O Dilbahar Sardar to H/O Late Syed Laskar. (93 mtr)
₹2,99,837
Completed
Recommended 21 Aug 2026 · sanctioned 9 Dec 2024 · completed 21 Aug 2026
Construction of CC Road from H/O Laxmi Kanta Sukla to Loknath Mandir. (100 mtr)
₹2,99,908
Completed
Recommended 21 Aug 2026 · sanctioned 28 Nov 2024 · completed 21 Aug 2026
Construction of CC Road from H/O Nurb Islam Gazi to H/O Jabirullah Laskar via H/O Sk Baharul. (153 mtr)
₹4,99,918
Completed
Recommended 21 Aug 2026 · sanctioned 9 Dec 2024 · completed 21 Aug 2026
Construction of CC Road From H/O Saidul Sarder to H/O Rausun Sarder(50 mtr)
₹99,800
Completed
Recommended 21 Aug 2026 · sanctioned 28 Nov 2024 · completed 21 Aug 2026
Construction of CC Road From H/O Sk Ramjan to H/O Rafikul Halder. (85 mtr)
₹2,99,840
Completed
Recommended 21 Aug 2026 · sanctioned 28 Nov 2024 · completed 21 Aug 2026
Construction of CC Road with Pilling from H/O Nirmal Nayek to H/O Ram Dayal Shaw at Subhas Pally. (55 mtr)
₹3,99,969
Completed
Recommended 21 Aug 2026 · sanctioned 9 Dec 2024 · completed 21 Aug 2026
Beutification of Chandi Doulatabad Health Centre.
₹4,99,895
Completed
Recommended 18 Mar 2026 · sanctioned 10 Jul 2025 · completed 18 Mar 2026
Construction of CC Road from House of Ajibar Sk to House of Marisal Haji. (Length- 75 Mtr)
₹1,99,292
Completed
Recommended 12 Mar 2026 · sanctioned 8 Sept 2025 · completed 12 Mar 2026
Construction of CC Road with Pilling from House of Ali Hossain Sah to House of Shah Hossain Sah at Uttar Kuleshwar. ( Length - 60 Mtr)Under Dearak G.P.
₹1,98,553
Completed
Recommended 12 Feb 2026 · sanctioned 23 Jun 2025 · completed 12 Feb 2026
Construction of CC Road with Pilling from House of Sumsuddin Sekh Via House of Manju Mir to House of Borjan Sk Via House of Mohan Mir (Length - 30 Mtr.) Under Dearak G.P.
₹1,98,555
Completed
Recommended 12 Feb 2026 · sanctioned 23 Jun 2025 · completed 12 Feb 2026
Construction of CC Road from House of Bishtupada Mondal towards House of Ratan Mondal. (Length- 42 Mtr.)
₹1,77,271
Completed
Recommended 10 Feb 2026 · sanctioned 10 Jul 2025 · completed 10 Feb 2026
Construction of CC Road with Pilling from House of Prosenjit Pal to House of Amal Mallik (Length- 50 Mtr.) Sansad-I Under Sarisha G.P within D.H-II P.S
₹2,32,580
Completed
Recommended 21 Jan 2026 · sanctioned 23 Jun 2025 · completed 21 Jan 2026
Construction of CC Road from Uchhekhali Deu Road towards House of Iyasin Sipai. (Length- 42 Mtr)
₹1,99,976
Completed
Recommended 30 Dec 2025 · sanctioned 10 Jul 2025 · completed 30 Dec 2025
Construction of C.C road from house of Manu Mallick to house of Rustam Mallick under Chatta GP. (148.5 mtr)
₹7,86,391
Completed
Recommended 24 Dec 2025 · sanctioned 2 May 2025 · completed 24 Dec 2025
Construction of CC road from Bagpara culvert to land of Pradip Kanji. (Length- 57.0 mtr) Mouza-Buita, J.L. no-33 under Budge Budge I Panchayat Samiti
₹1,98,015
Completed
Recommended 18 Dec 2025 · sanctioned 19 Jun 2025 · completed 18 Dec 2025
Construction of C.C. road with protection wall from Shop of Babulala Sardar to H/O Judhistri Sardar at Raskhali. (86 mtr)
₹2,67,517
Completed
Recommended 18 Dec 2025 · sanctioned 31 Dec 2024 · completed 18 Dec 2025
Construction of CC road from house of Swapan Pandit to house Dibyendu Pandit at Ghantapara under North Bawali GP. (Length- 52.0 mtr)
₹1,99,562
Completed
Recommended 18 Dec 2025 · sanctioned 12 Sept 2025 · completed 18 Dec 2025
Construction of CC Road with Brick Soling from H/O Gokul Das to H/O Maidul Fakir at Nabasan. (151 mtr.)
₹3,66,688
Completed
Recommended 18 Dec 2025 · sanctioned 27 Nov 2024 · completed 18 Dec 2025
Construction of CC Road With Brick Soling from Shop of Ranajit Adhikary towards house of Shyamsundar Pal at Dongaria Raipur. (Length- 45.0 mtr)
₹1,95,902
Completed
Recommended 18 Dec 2025 · sanctioned 12 Sept 2025 · completed 18 Dec 2025
Construction of CC Road with Pilling from Behind of Gobindapur Kalicharan High School towards Radha Madhab Temple (Length- 126 Mtr) Near Goanara Pole, Sansad-VIII Under Mathurg.P within D.H-II P.S
₹3,82,987
Completed
Recommended 18 Dec 2025 · sanctioned 23 Jun 2025 · completed 18 Dec 2025
Construction of CC Road with Pilling from Saipara Koltala to Bottala (100 mtr) at Patdaha, Sansad-II Under Kamarpole G.P within D.H-II P.S
₹4,05,505
Completed
Recommended 18 Dec 2025 · sanctioned 23 Jun 2025 · completed 18 Dec 2025
Construction of CC road with road protection wall from house of Debdas Ghanti to house of Ganesh Bodhok at Malongadar under South Bawali GP.(Length - 30 mtr)
₹1,47,784
Completed
Recommended 18 Dec 2025 · sanctioned 12 Sept 2025 · completed 18 Dec 2025
Construction of CC road with road protection wall from house of Sudarshan Madari to house of Krishnapada Makhal at Ghanashyambati Under South Bawali GP. (Length - 90 mtr)
₹2,99,303
Completed
Recommended 18 Dec 2025 · sanctioned 12 Sept 2025 · completed 18 Dec 2025
Construction of PCC road from house of Abdul Hai Mallick to house of Habib Mallick at ALampur under Kashipur Alampur GP. (Length- 137 mtr)
₹3,47,427
Completed
Recommended 18 Dec 2025 · sanctioned 12 Sept 2025 · completed 18 Dec 2025
Construction of CC road from Land of Baka Morol to land of Prasenjit Kanji. (Length- 57.0 mtr) Mouza-Buita, J.L. no-33 under Budge Budge I Panchayat Samiti
₹1,97,901
Completed
Recommended 17 Dec 2025 · sanctioned 19 Jun 2025 · completed 17 Dec 2025
Construction of CC Road with Pilling from House of Karimulla to House of Yusuf Molla (119M) at Hincheberia , Sansad-VII Under Kamarpole G.P within D.H-II P.S
₹2,99,630
Completed
Recommended 17 Dec 2025 · sanctioned 23 Jun 2025 · completed 17 Dec 2025
Construction of CC Road with Pilling from Aoyashberia Hari Mandir to House of Nakul Halder via House of Purnima Naskar to House of Palash Halder (Length-129 Mtr) at Aoyashberia, Sansad-II Under Khorda G.P within D.H-II P.S
₹3,08,422
Completed
Recommended 17 Dec 2025 · sanctioned 23 Jun 2025 · completed 17 Dec 2025
Construction of CC road from House of Vola Mayra to House of Subhas Jhari Munna near ward-7 Community Hall within ward-07 under DHM. (Length- 70.0 mtr)
₹2,40,978
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Construction of CC Road from shop of Mangal Das to House of Putul Bag within Ward-16 under DHM. (Length- 32.00 mtr)
₹1,54,862
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Construction of CC Road near House of Hatem Sekh to House of Saruk Sekh at Newtown within ward-02 under DHM. (Length- 71.0 Mtr.)
₹2,13,202
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Aikka Sammilini Club at Purba Para (ii) Near Bhai Bhai Sangha at Dakshin Para within ward-08 under DHM.
₹1,11,967
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Baisakhi Sangha at Paschimpara (ii) Near Pump House at C.I. Gali within ward-03 under DHM.
₹1,11,542
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Cultural Platform at Bata Petrol Pump area (ii) Near Leninnagar Park at Leninnagar within ward-12 under DHM.
₹1,10,304
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) near Halderpara more and (ii)Near Bhishnu Brick field more within ward-01 under DHM.
₹1,11,684
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Kali Mandir at Satpally (ii) Near Parichay Baganbari at beside Lalpole Natunpole road within ward-13 under DHM.
₹1,10,513
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Kiran Tea Shop at Civil Court Para (ii) Near Surja Tarun at Puratan Bazar within ward-14 under DHM.
₹1,12,172
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Sakti Sangha at Rabindranagar Bypass (ii) Near Surjatarun Sangha at Madhabpur within ward-10 under DHM.
₹1,10,164
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) Near Sarada Sarani at Natunpara (ii) Near Battala at Pirichpur within ward-06 under DHM.
₹1,12,038
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Installation of 9.0 Mtr. Octagonal Minimast (i) near Trikon Park at Dakshinpara (ii) Near Kali Mandir at Uchumati within ward-04 under DHM.
₹1,11,825
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Repairing of CC road from House of Tapas Tunga to House of Sekhar Mondal (Length- 70.0 Mtr) at Kalinagar within ward-05 under DHM
₹1,91,281
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Repairing of CC road from shop of Salauddin Sekh to House of Jiyauddin Adalder at Adalderpara within Ward-15 under DHM. (Length- 80.00 mtr)
₹1,94,678
Completed
Recommended 16 Dec 2025 · sanctioned 19 Jun 2025 · completed 16 Dec 2025
Construction of CC Road from House of Ammad Khalasi towards House of Nasir Molla (Length- 186Mtr) at Patra, Sansad-XXI Under Patra G.P within D.H-II P.S
₹3,00,520
Completed
Recommended 10 Dec 2025 · sanctioned 23 Jun 2025 · completed 10 Dec 2025
Construction of CC Road from House of Samaji Das towards Pond Side Culvert of topjel Sk. (Length-194 Mtr) at Noorpur, Sansad-VI Under Noorpur G.P within D.H-II P.S
₹3,99,380
Completed
Recommended 10 Dec 2025 · sanctioned 23 Jun 2025 · completed 10 Dec 2025
Construction of CC Road from House of Momen Laskar to House of Rakib Laskar Via House of Jamir Laskar and Moinul Mallick at Basuldanga (Length-100.00 Mtr.) Under Basuldanga G.P.
₹2,89,168
Completed
Recommended 28 Nov 2025 · sanctioned 23 Jun 2025 · completed 28 Nov 2025
Construction of CC Road from House of Mahasin Sk towards House of Nurislam Sk at Doulatabad. (Length- 40 Mtr)
₹1,75,021
Completed
Recommended 15 Oct 2025 · sanctioned 16 Jun 2025 · completed 15 Oct 2025
Construction of CC Road from Moruiberia Mollik Para Saner Ghat to House of Rahim Mallik (Length-116.68 Mtr.)Under Basuldanga G.P.
₹1,61,360
Completed
Recommended 15 Oct 2025 · sanctioned 23 Jun 2025 · completed 15 Oct 2025
Construction of CC Road from House of Basudeb Mondal to Garden of Punnya Bera. (Length-46 Mtr. Width-1.8 Mtr.)
₹1,21,569
Completed
Recommended 14 Oct 2025 · sanctioned 27 May 2025 · completed 14 Oct 2025
Construction of CC Road from House of Bhabani Mondal to House of Nirapada Mondal. (Length-37 Mtr. Width-1.8 Mtr.)
₹1,99,677
Completed
Recommended 14 Oct 2025 · sanctioned 27 May 2025 · completed 14 Oct 2025
Construction of CC road with UC Ballah Pilling from house of Ashique to house of Bapi at Chalk Nabasan. (Length- 35.0 mtr)
₹3,49,599
Completed
Recommended 9 Oct 2025 · sanctioned 8 Aug 2025 · completed 9 Oct 2025
Supply and Installation of 6 mtr GI Pole Solar Street Lights (20 Watt LED) at PS VI, PS VII and VIII under Nischintapur GP.
₹4,83,048
Completed
Recommended 8 Oct 2025 · sanctioned 19 Jun 2025 · completed 8 Oct 2025
Supply and Installation of 1 No. 9 Mtr. Long Solar Mini Mast Light(Supplying of Hexagonal Gi Pole of 4mm Thickness Single Section Min 340 mm Base Dia,150mm top Dia with 4 Nos 40 W Led with Minimum Colour Temperature (Cct) 5500-6500K Minimum Typical Luminious Flox 150Lm per W 1.E,Minimum 3600 Lm (Philips,Osram) and Supplying of 12.8V,60Ah Lithium Ferro Phosphate (Life Po4) Batteries. The Batteries Should Have Battery Management System (Bms). at Krishnarampur Nice Club Ground.
₹2,00,000
Completed
Recommended 24 Sept 2025 · sanctioned 16 Jun 2025 · completed 24 Sept 2025
Construction of CC Road from House of Birender Singh to House of Bibha Sau Via House of Sanat Mondal to House of Ekha Mondal. (Length- 100 Mtr) and Construction of a Culvart near House of Birender Singh. At Nawsha, Sansad-XV Under Sarisha G.P within D.H-II P.S
₹2,58,186
Completed
Recommended 23 Sept 2025 · sanctioned 23 Jun 2025 · completed 23 Sept 2025
Construction of CC Road from Naoga Mandir Tala to House of Badal Hati Under Masat G.P.(Length-86.5 Mtr.)
₹1,99,638
Completed
Recommended 23 Sept 2025 · sanctioned 23 Jun 2025 · completed 23 Sept 2025
Construction of CC road with piling from house of Jakir Molla to house of Salam Molla via Patalpunja Sanerghat. (Length- 157 Mtr) under Patra GP
₹3,00,483
Completed
Recommended 23 Sept 2025 · sanctioned 23 Jun 2025 · completed 23 Sept 2025
Installation of Electric Mini Mast Light (9M Hexagonal Pole and 5Nos 250W Led Flood Light) Near Missionary of Charity, Sansad-XVIII Under Noorpur G.P within D.H-II P.S
₹1,94,872
Completed
Recommended 22 Sept 2025 · sanctioned 23 Jun 2025 · completed 22 Sept 2025
Supply and Installation of 1 No. 9 Mtr Long Solar Mini Mast Light(Supplying of Hexagonal GI Pole of 4mm Thickness Single Section Min 340 mm Base Dia,150mm top Dia with 4 Nos 40 W Led with Minimum Colour Temperature (Cct) 5500-6500K Minimum Typical Luminious Flox 150Lm W 1.E,Minimum 3600 Lm (Philips,Osram) and Supplying of 12.8V, 60Ah Lithium Ferro Phosphate (Life Po4) Batteries. The Batteries Should Have Battery Management System (Bms), at Uttar Kanpur Rakhal Thakur Tala Under Kanpur Dhanberia
₹1,99,218
Completed
Recommended 22 Sept 2025 · sanctioned 16 Jun 2025 · completed 22 Sept 2025
Construction of CC Road from Ghatu Bagan Bari to House of Bedas Mondal to House of Anil Adak Via House of Shymal Adak Under Masat G.P.(Length-135 Mtr.)
₹3,45,386
Completed
Recommended 19 Sept 2025 · sanctioned 23 Jun 2025 · completed 19 Sept 2025
Construction of CC Road from House of Indrajit Das to House of Avijit Halder Via Radha Gobinda Temple to House of Basudeb Das Under Kanpur Dhanberia Gp (Length-72Mtr)
₹1,48,968
Completed
Recommended 15 Sept 2025 · sanctioned 23 Jun 2025 · completed 15 Sept 2025
Construction of CC Road with Pilling from Koraiberia Wooden Pole to Magura Swasan Via Kobor Danga (Length- 140 Mtr) at Koraiberia, Sansad-I Under Mathur G.P within D.H-II P.S
₹3,00,706
Completed
Recommended 15 Sept 2025 · sanctioned 23 Jun 2025 · completed 15 Sept 2025
Construction of CC road from house of Hamid Mallick to house of Arabindu Pandey at Nandarampur. (Length- 75 mtr)
₹1,95,881
Completed
Recommended 12 Sept 2025 · sanctioned 24 Jun 2025 · completed 12 Sept 2025
Construction of CC Road with Pilling from House of Panchu Gopal Mondal to House of Sunil Mondal ( Length - 90 Mtr.) Under Parulia G.P
₹1,98,682
Completed
Recommended 12 Sept 2025 · sanctioned 23 Jun 2025 · completed 12 Sept 2025
Installation of 10 numbers Solar Light at 10 booths of Chingripota GP under Budge Budge I.
₹3,97,407
Completed
Recommended 11 Sept 2025 · sanctioned 19 Jun 2025 · completed 11 Sept 2025
Construction of C C Road with Pilling from H/O Sk Jalal to H/O Sk Jahangir.(86 mtr)
₹3,93,322
Completed
Recommended 10 Sept 2025 · sanctioned 12 Feb 2025 · completed 10 Sept 2025
Construction of CC Road from Bahirkunja ICDS Center to House of Sadhan Halder via House of Sahadeb Sardar. (Length-127 Mtr. Width-1.500 Mtr.)
₹2,41,426
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Construction of CC Road from Garden of Amarendra Nath Samanta towards Garden of Amiya Samanta. (Length-84.8 Mtr, Width-1.8 Mtr.)
₹1,99,719
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Construction of CC Road from H/O Ranajit Naskar to H/O Punna Ch. Mondal. (70 mtr)
₹2,07,056
Completed
Recommended 10 Sept 2025 · sanctioned 12 Feb 2025 · completed 10 Sept 2025
Construction of CC Road From H/O Sk Kochi towards H/O Sk Sajamal. (127 mtr)
₹3,93,193
Completed
Recommended 10 Sept 2025 · sanctioned 12 Feb 2025 · completed 10 Sept 2025
Construction of CC Road from House of Mrintunjay Chakraborty to House of Laltu Chakraborty. (Length-37 Mtr. Width-1.5 Mtr.)
₹83,083
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Construction of CC Road from House of Prasenjit Pramanick to House of Kashinath Pramanick. (Length-48 Mtr. Width-1.3 Mtr.)
₹1,23,793
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Construction of CC Road from Pond of Shambhu Halder to House of Mukta Halder. (Length-61 Mtr. Width-1.4 Mtr.)
₹1,67,237
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Construction of CC Road with Pilling from House of Dilip Das to House of Haripada Mistry. (Length-52 Mtr. Width-1.5 Mtr.)
₹1,42,801
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Construction of CC Road with Pilling from House of Sankar Sardar to House of Panchu Maity. (Length-38 Mtr. Width-1.5 Mtr.)
₹2,48,824
Completed
Recommended 10 Sept 2025 · sanctioned 27 May 2025 · completed 10 Sept 2025
Supply and Installation of 6 Mtr. GI Pole Solar Street Lights (20 Watt LED) at PS III, PS IV and PS V of Mayapur GP under Budge Budge I Panchayat Samiti.
₹3,71,579
Completed
Recommended 9 Sept 2025 · sanctioned 19 Jun 2025 · completed 9 Sept 2025
Construction of CC Road from House of Jahangir Sardar towards House of Yunus Sardar at Daulatpur. (Length- 41 Mtr)
₹1,99,426
Completed
Recommended 2 Sept 2025 · sanctioned 10 Jul 2025 · completed 2 Sept 2025
Construction of CC Road from House of Kiran Kunti towards House of Kumkum Sarkar at Bishnupur Chirstian Para. (Length- 33 Mtr)
₹1,48,550
Completed
Recommended 2 Sept 2025 · sanctioned 16 Jun 2025 · completed 2 Sept 2025
Construction of CC Road from Khirishtala Main Road towards House of Rabin Sing. (Length-48 mtr)
₹2,00,000
Completed
Recommended 2 Sept 2025 · sanctioned 16 Jun 2025 · completed 2 Sept 2025
Installation of Solar High Mast Light near Gharami Para Janajar Math.
₹1,98,890
Completed
Recommended 2 Sept 2025 · sanctioned 16 Jun 2025 · completed 2 Sept 2025
Construction of CC Road from House of Bhavani Sardar to House of Swapan Das. (Length - 121.9 mtr, Width - 02 Mtr)
₹3,00,000
Completed
Recommended 29 Aug 2025 · sanctioned 10 Jul 2025 · completed 29 Aug 2025
Construction of CC road from house of Nepal Pal to House of Soumen Pal. (Length- 161.5 Mtr, Width- 02 Mtr)
₹3,50,000
Completed
Recommended 29 Aug 2025 · sanctioned 17 Jul 2025 · completed 29 Aug 2025
Construction of CC road with bricks soling from House of Ashis Sardar to House of Kachari Sardar. (Length- 161.5 Mtr, Width- 02 Mtr)
₹3,50,000
Completed
Recommended 29 Aug 2025 · sanctioned 17 Jul 2025 · completed 29 Aug 2025
Construction of CC road with pilling from House of Asmot Khan to House of Jamad Sekh. (Length- 140.2 Mtr, Width- 02 Mtr)
₹3,00,000
Completed
Recommended 29 Aug 2025 · sanctioned 17 Jul 2025 · completed 29 Aug 2025
Construction of CC road from House of Sundar Malik to House of Suman Roy at Bonhogla Village. (Length- 161.5 mtr, width- 02 mtr.)
₹3,50,000
Completed
Recommended 28 Aug 2025 · sanctioned 17 Jul 2025 · completed 28 Aug 2025
Construction of CC road with piling from Bonhogla Masjid to House of Sohid sk at Bonhogla Village. (Length- 161.5 mtr, Width- 02 mtr)
₹3,50,000
Completed
Recommended 28 Aug 2025 · sanctioned 17 Jul 2025 · completed 28 Aug 2025
Construction of CC road from House of Sajahan Sekh to House of Anwar Molla at Mulpunja. (Length- 114.9 Mtr, Width- 02 Mtr)
₹2,49,995
Completed
Recommended 27 Aug 2025 · sanctioned 17 Jul 2025 · completed 27 Aug 2025
Construction of CC road from House of Tarun Halder to House of Mahadeb Kayal at Malipukur Village. (Length - 114.9 Mtr, Width- 02 Mtr)
₹2,49,995
Completed
Recommended 27 Aug 2025 · sanctioned 17 Jul 2025 · completed 27 Aug 2025
Construction of cement concrete road at Adhar Das road by lane from Adhar Das road party office to Malik house and from the Rastogi house upto the house of Amar Pramanick. (Length 85.0 Meter)
₹1,28,144
Sanctioned
Recommended 26 Aug 2025 · sanctioned 19 Sept 2025
Construction of CC Road from House of Chandi Halder to House of Jaydeb Halder Via House of Animesh Halder and Timir Halder at Bolsiddhi(Length-117.78 Mtr.)Under Bolsidhi Kalinagar Gp
₹1,99,979
Completed
Recommended 25 Aug 2025 · sanctioned 23 Jun 2025 · completed 25 Aug 2025
Construction of CC Road from House of Khokan Gayen towards House of Dhiman Das at Nursikdarchak. (Length- 47 Mtr)
₹2,47,250
Completed
Recommended 25 Aug 2025 · sanctioned 16 Jun 2025 · completed 25 Aug 2025
Construction of CC road from Panchananda Mandir to house of Lata Ray at Rajarampur. (Length- 138 mtr)
₹2,00,014
Completed
Recommended 22 Aug 2025 · sanctioned 24 Jun 2025 · completed 22 Aug 2025
Construction of CC Road from H/O Pulak Das to land of Kashinath Poddar. (138 mtr)
₹3,32,672
Completed
Recommended 21 Aug 2025 · sanctioned 24 Dec 2024 · completed 21 Aug 2025
Construction of CC Road from House of Kartik Mondal towards House of Tapan Hazra. (Length- 45 Mtr)
₹1,94,209
Completed
Recommended 18 Aug 2025 · sanctioned 16 Jun 2025 · completed 18 Aug 2025
Construction of CC Road with Protection wall from House of Sanyashi Naskar to House of Sujit Chakraborty. (101.0 mtr.)
₹4,97,132
Completed
Recommended 18 Aug 2025 · sanctioned 22 May 2025 · completed 18 Aug 2025
Construction of CC Road from H/O Abu Molla to H/O Mehebub Molla. (95 mtr)
₹3,35,816
Completed
Recommended 14 Aug 2025 · sanctioned 24 Dec 2024 · completed 14 Aug 2025
Construction of CC Road from H/O Abur Ali Jamadar to H/O Aslam Jamadar.(132 mtr)
₹3,32,461
Completed
Recommended 14 Aug 2025 · sanctioned 27 Nov 2024 · completed 14 Aug 2025
Construction of cement concrete road and drain from house of Sunil Mondal to house of Dilip Das in ward no. 3 (length 25.0 mtr.)
₹75,000
Sanctioned
Recommended 11 Aug 2025 · sanctioned 21 Nov 2025
Construction of cement concrete road and drain from infront of house of Nanugopal Chandra upto house of Biswanath Das at RN Tagore road under ward no.4 (length -30.0 mtr)
₹1,64,000
Sanctioned
Recommended 11 Aug 2025 · sanctioned 21 Nov 2025
Construction of C.C road with Protection Wall from H/O Bablu Gazi to H/O Ambiya Molla at Baidyapara. (32 mtr)
₹1,94,994
Completed
Recommended 6 Aug 2025 · sanctioned 21 Nov 2024 · completed 6 Aug 2025
Construction of CC Road from H/O Nemai Santra to H/O Khokan sekh. (100 mtr)
₹3,99,673
Completed
Recommended 5 Aug 2025 · sanctioned 24 Dec 2024 · completed 5 Aug 2025
Construction of CC road with pilling from H/O Joydev Shee to H/O Baddinath Shee. (120 mtr)
₹3,98,072
Completed
Recommended 5 Aug 2025 · sanctioned 24 Dec 2024 · completed 5 Aug 2025
Construction of CC Road from H/O Tapas Das to H/O Ajijul Sk towards Jayguru Sweet Shop. (324 mtr.)
₹6,05,424
Completed
Recommended 1 Aug 2025 · sanctioned 27 Nov 2024 · completed 1 Aug 2025
Construction of CC Road with Pilling from Goragacha Giyas's Shop to Janaalom's Shop. (70 mtr.)
₹3,42,338
Completed
Recommended 1 Aug 2025 · sanctioned 27 Nov 2024 · completed 1 Aug 2025
Construction of CC road with protection wall from house of Ranajit Bhattacharjya towards house of Aditya Manna at Nischintapur GP Sansad IX under Budge Budge I PS (20.50 mtr)
₹99,575
Completed
Recommended 1 Aug 2025 · sanctioned 22 May 2025 · completed 1 Aug 2025
Construction of CC Road from Nainan Black top road(College More) towards Sishuram Das College. (50 mtr.)
₹2,23,844
Completed
Recommended 31 Jul 2025 · sanctioned 27 Nov 2024 · completed 31 Jul 2025
Construction of CC Road from H/O Monoronjon Mondal to Gogon Koyila More at Paschim Khordonalha (Booth No 63). (194 mtr.)
₹4,48,824
Completed
Recommended 31 Jul 2025 · sanctioned 27 Nov 2024 · completed 31 Jul 2025
Construction of CC Road with Gaurdwall from Uttar Laskar Para Night Rose Club to H/O Mintu Laskar. (215 mtr.)
₹7,08,547
Completed
Recommended 31 Jul 2025 · sanctioned 27 Nov 2024 · completed 31 Jul 2025
Purchase of an ambulance (Four Wheelers) with medical accessories for local emergency response services.
₹8,47,260
Sanctioned
Recommended 24 Jul 2025 · sanctioned 13 Aug 2025
Purchase of an ambulance (Four Wheelers) with medical accessories for local emergency response services.
₹8,40,963
Sanctioned
Recommended 24 Jul 2025 · sanctioned 3 Nov 2025
Purchase of an ambulance (Four Wheelers) with medical accessories for local emergency response services.
₹8,44,760
Recommended
Recommended 24 Jul 2025
Purchase of an ambulance (Four Wheelers) with medical accessories for local emergency response services.
₹8,50,226
Sanctioned
Recommended 24 Jul 2025 · sanctioned 15 May 2026
Construction of CC Road from H/O Kadan Bar to H/O Rana Bar at Ghanshyambati- I (30 mtr)
₹96,101
Completed
Recommended 16 Jul 2025 · sanctioned 12 Feb 2025 · completed 16 Jul 2025
Construction of C.C road from Jagannathpur H/O Gour Mohan Dey to H/O Pintu Halder Under Ashuti-II GP. (150 mtr)
₹4,49,616
Completed
Recommended 14 Jul 2025 · sanctioned 9 Jan 2025 · completed 14 Jul 2025
Construction of CC Road with Pilling from H/O Kutub Shah to H/O Mashem Laskar at Mohanpur. (115.33 mtr.)
₹3,39,238
Completed
Recommended 10 Jul 2025 · sanctioned 28 Feb 2025 · completed 10 Jul 2025
Construction of C C Road from Aima Masjid to H/O Sajamal at Aima. (36 mtr)
₹2,96,972
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road from Deshbandhu Club to H/O Subhas Mallick at Chakparan.(167 mtr)
₹3,89,748
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road from H/O Bapi Mondal to H/O Nisikanta Mondal at Ghanshyambati- III (30 mtr)
₹98,634
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road from H/O Basudeb Mistry to H/O Mithu Mondal. (42 mtr)
₹2,00,047
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road from H/O Mrityunjay Mandal to H/O Ranjit Mondal at South bawali. (40 mtr)
₹93,262
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC road from H/O Pulak Majee to H/O Laltu Majee, at Sansad VII. (71 mtr)
₹1,93,551
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road from H/O Sanjoy Das to Mohonpur Foot Ball Ground. (138 mtr)
₹4,09,336
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road from H/O Sk Ejajul to H/O Habibur. (106 mtr)
₹3,79,459
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of CC Road with pilling from H/O Mr. Kalam Mallick to H/O Mr. Rahaman Mallick . (100 mtr)
₹2,96,746
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of PCC Road with Pilling from H/O Mahadeb Mondal to H/O Pradip Mondal. (111 mtr)
₹3,97,308
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of protection wall near pond of Rahaman Molla. (40 mtr)
₹1,98,906
Completed
Recommended 9 Jul 2025 · sanctioned 12 Feb 2025 · completed 9 Jul 2025
Construction of Road with Pilling from Goffer Molla's shop to H/O Lokman Sekh At Sultanganja. (100 mtr)
₹3,29,103
Completed
Recommended 7 Jul 2025 · sanctioned 24 Dec 2024 · completed 7 Jul 2025
Construction of C.C road with road protection wall from Rasapunja H/O Balai Naskar to H/O Montu Naskar at Rasapunja. (55 mtr)
₹1,99,845
Completed
Recommended 25 Jun 2025 · sanctioned 9 Jan 2025 · completed 25 Jun 2025
Construction of CC Road With protection Wall from H/O Joydeb Dalui to H/O Bhuth Nath Dalui. (69 mtr)
₹3,01,378
Completed
Recommended 20 Jun 2025 · sanctioned 12 Feb 2025 · completed 20 Jun 2025
Construction of CC Road from Hati Bhanga Pole to Muktar Ration Shop. (145.8 mtr)
₹3,99,060
Completed
Recommended 20 Jun 2025 · sanctioned 27 Nov 2024 · completed 20 Jun 2025
Construction of CC road with protection wall from H/O Avay Nath towards H/O Debabrata Manna at Nischintapur GP Sansad IX under Budge Budge I PS (50 mtr)
₹1,99,795
Completed
Recommended 20 Jun 2025 · sanctioned 12 Feb 2025 · completed 20 Jun 2025
Construction of Brick Soling Road from H/O Sourav Mukherjee to H/O Shambhu Patra at Ward No.5 (50 mtr.)
₹1,48,128
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of CC Road at Halder Para from H/O Panchanan Halder to H/O Bagamber Khanra (82 mtr.) at Ward No.15
₹1,52,500
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of CC Road at Vidyasagar Pally Natun Para from H/O Tarun Sheet to H/O Runa Dhela at Ward No.4 (40 mtr.)
₹1,50,072
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of CC road cum pathway within Trikon Park. (71.25 mtr.)
₹1,45,816
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of CC Road from near H/O Kabita Mondal to H/O Panchanan via H/O Pritam Halder to H/O Tapan Halder within Ward No.3 (49.80 mtr)
₹1,44,874
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of CC Road from near Raja Mukherjee's house to H/O Manas Das at Ward No.14 (97 mtr)
₹1,51,635
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of CC road with surface drain from near H/O Ranjan Chatterjee to Netaji Road at Ward No.16 (25.20 mtr.)
₹1,46,069
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Construction of drain with cover slap from H/O Hanif Sk to H/O Akbar Sk at Ramrampur within Ward No.1 (60 mtr)
₹1,54,554
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Repair of CC Road from Bangal Para to By-Pass Road at Ward No.10 (80 mtr.)
₹1,02,092
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Repairing of CC Road at Das Para from H/O Batul Mistry to H/O Tapan Rana at Ward No.8 (95 mtr.)
₹1,47,843
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Repairing of CC Road from H/O Motiyar Rahaman Molla to H/O Bapi Manna at Railway Colony at Ward No.12 (88 mtr.)
₹1,48,437
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Repairing of CC Road from Near H/O Dulal Das to H/O Chandan Das at Ward No.7 (72 mtr.)
₹1,46,182
Completed
Recommended 4 Jun 2025 · sanctioned 24 Dec 2024 · completed 4 Jun 2025
Beutification and Renovation of Chandi Doulatabad BPHC.
₹4,49,568
Completed
Recommended 3 Jun 2025 · sanctioned 21 Nov 2024 · completed 3 Jun 2025
Construction of C.C road from H/O Jayanta Sardar to H/O Dilip Naskar at Chakrasunmamud. (126 mtr)
₹3,49,830
Completed
Recommended 3 Jun 2025 · sanctioned 26 Dec 2024 · completed 3 Jun 2025
Construction of CC Road from Mithapukur Baro Masjid towards H/O Lata Mallik. (74.5 mtr)
₹3,00,680
Completed
Recommended 30 May 2025 · sanctioned 12 Feb 2025 · completed 30 May 2025
Construction of CC Road with Guard Wall from Nibaran Dutta Road to Vidyanagar Karmatirtha. (110 mtr)
₹3,35,555
Completed
Recommended 29 May 2025 · sanctioned 27 Nov 2024 · completed 29 May 2025
Construction of CC Road from H/O Gandhi Jana to H/O Amit Jana at Bakhrahat GP. (98 mtr)
₹2,89,413
Completed
Recommended 28 May 2025 · sanctioned 24 Dec 2024 · completed 28 May 2025
Construction of C.C road with road protection wall from H/O Prabir Mondal to H/O Krishnendu Das at Ganneygangadharpur. (145 mtr)
₹3,49,139
Completed
Recommended 26 May 2025 · sanctioned 9 Jan 2025 · completed 26 May 2025
Construction of CC road from House of Pradip Naskar to House of Sk Jakir Hosen at Sukhdevpur. (Length- 50 mtr)
₹84,109
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Drain from behind the house of Sri Milan Pramanick to house of Sri Malay Das at Lokemanya Tilak Road bye Lane under Ward No.-9. (Length- 85 mtr)
₹2,30,000
Sanctioned
Recommended 23 May 2025 · sanctioned 13 Aug 2025
Construction of CC Drain With Slab From Bandal Road to Bimal Duari Miter Box. (Length- 11 mtr)
₹48,056
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Drain With Slab From House of Somir Naskar To Moni Khal at Bhatsala Road. (Length- 12 mtr)
₹57,829
Ongoing
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road from House of Jashoda Sah to House of Vola Ghosh at Nabapally. (Length- 102.0 mtr)
₹2,52,305
Sanctioned
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road at Chanditala bye lane from House of Sk Sharukh to House of Sk Moinuddin under Ward no. 06. (Length- 110 mtr)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Sept 2025
Construction of CC road from Chitta Park to House of Pandey at Sapamirza nagar. (Length- 35 mtr)
₹1,30,813
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of Mosaraf Laskar to house of Sahajahan at Mondal Para. (Length- 32.0 mtr)
₹2,56,995
Ongoing
Recommended 23 May 2025 · sanctioned 8 Aug 2025
Construction of CC Road from House of Anjan Dasgupta to Suresh Upadhyay Flat. (Length- 80.0 mtr)
₹2,61,992
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of Asit Paul to house of Anup Majumder. (Length- 85.0 mtr)
₹2,17,166
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of Balaram Pramanick to house of Priti Maity Via house of Sandhyarani Patra at Hentalkhali Purba Para. (Length- 85 mtr)
₹2,56,915
Ongoing
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road from house of Bhola Das to house of Lily Chakraborty Via house of Ashis Roy to house of Dilip Deb.(Length- 80.0 mtr)
₹2,56,878
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of Gautam Das to House of Suman Das at Nungi Chatterjee Para Adarsha Pally. (Length- 112.0 mtr)
₹2,56,744
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of Hanif Gazi to house of Bapi Mondal At Khadim Para. (Length- 62 Mtr)
₹2,60,249
Ongoing
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road From House of Kalpana Sarkar to House of Promila Gayen. (Length- 30 mtr)
₹1,27,217
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of late Palash Das to house of Debobrata Roy Via house of Mintu Pandit at Chanditala. (Length- 60 mtr)
₹2,56,993
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road From House of Madan Sutradhar to House of Susanta Mondal at Dakshin Ganipur. (Length- 45 mtr)
₹2,55,614
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from House of Paban Sharma to House of Biswanath Mondal. (Length- 135 mtr)
₹2,48,000
Ongoing
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road from house of Rupa naskar to House of Chottu da. (Length- 50 mtr)
₹2,57,098
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road From House of Sianowara Bibi to House of Saiful Koyal. (Length- 55.0 mtr)
₹2,55,449
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from house of Sk Habib Ali (Raja) of 153, Dharmata Road to house of Sk Mokbul Ali of 150, Dharmatala Road in Ward no. 12. (Length- 102 mtr)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 13 Aug 2025
Construction of CC Road from opposite of Frinds Corner Club at K.B. Paul Road (Sujan Goli) to house of Achalesh Chakraborty at Ward no. 13. (Length- 120 mtr)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 13 Aug 2025
Construction of CC Road from Opposite of Triveni tirtha club to house of Happy Sarkar. (Length- 130 mtr)
₹2,19,473
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from Rinku shop to house of Kader Mondal at Memanpur Ward No. 29 (Length- 55.0 mtr.)
₹2,56,882
Ongoing
Recommended 23 May 2025 · sanctioned 21 Aug 2025
Construction of CC Road from Shitala Temple to house of Kestho Mondal at Beledanga. (Length- 150 mtr)
₹2,51,382
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of cc road from the house of baby barua to house of Ashim. (Length- 65 mtr)
₹2,56,630
Sanctioned
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of CC road from the House of Gopal Guchhaiet to House of Laltu Samanta at Mehta Road in Ward No. 16. (Length- 100 mtr)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 13 Aug 2025
Construction of CC Road With Cover Slab drain From House of Rob Kaka to House of Nuro Kena. (Length- 60 Mtr)
₹2,99,953
Sanctioned
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road with pucca drain at Adhar Das Road bye Lane from Bose Para More to house of Smt. Poly Malik and from the house of Dhiman babu to the house of Balai babu at Ward no. 14. (Length- 85 mtr)
₹2,30,000
Sanctioned
Recommended 23 May 2025 · sanctioned 13 Aug 2025
Construction of cement concrete Road from House of Kabita Ghosh upto House of Sujit Sardar under ward no 07 (Length- 110.0 mtr)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Sept 2025
Construction of cement concrete road from house of Prasanta Kor to house of Alock Samanta at Pandit Matilal Naharu Road. (Length- 61.0 mtr) and Construction of cement concrete road from house Suparna Chakraborty to house of Pranab Das at Mansatala. (Length 15.0 mtr) in ward no. 10
₹1,26,500
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Sept 2025
Construction of cement concrete Road from House of Rupali Bag to House of Monojit Barui under Ward no. 03 (Length- 71.0 mtr)
₹1,35,000
Sanctioned
Recommended 23 May 2025 · sanctioned 21 Nov 2025
Construction of cement concrete Road from House of Srikanta to House of Paresh Gayen at R N Tagore Road in Ward no. 04 (Length- 36.0 mtr)
₹46,000
Sanctioned
Recommended 23 May 2025 · sanctioned 21 Nov 2025
Construction of cement concrete road from Millat Urdu School upto Idgah math at charial bachelor road 2nd in ward no 17 (length 60 mtr.)
₹2,30,000
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Sept 2025
Construction of cement concrete Road from Ramjan Ali shop to house of Shaw Mahammad at Vidyasagar road in ward no. 5 (Length- 102.0 mtr)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 21 Nov 2025
Construction of cover drain from house of Kalam Mallik to house of Sekendar Midday at Uttar Ganipur. (Length- 65 mtrs)
₹2,64,194
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of cover slab Drain from Jana Samaj Club to house of Gofur Molla at Fakir Para. (Length- 50 Mtr)
₹2,31,022
Sanctioned
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of drain from house of Subrata Roy upto house of Rakesh Rajbhar at Mazdoor lane of Caledonian Jute Mill in Ward No. 20. (Length- 119.0 mtr.)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Nov 2025
Construction of drain Road from house of Sk Rakesh upto Sk Abul Kalam at HMM road in ward no. 19 (length 106.5 mtr.)
₹2,10,000
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Sept 2025
Construction of Drain With Cover Slab From House of Mostakin Bata Wala to House of Mojjamill Bata Wala. (Length- 50 mtr)
₹1,99,890
Ongoing
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of Drain With Cover Slab From Kali Mandir to House of Nepal. (Length- 57 mtr)
₹2,60,445
Ongoing
Recommended 23 May 2025 · sanctioned 1 Aug 2025
Construction of pucca drain from house of Tapan Das to House of Jagannath Chakraborty at Monsatala Road. (Length- 59.5 mtr)
₹83,500
Sanctioned
Recommended 23 May 2025 · sanctioned 19 Nov 2025
Construction of Surface Drain from house of Bacchan Singh to house of Sangram Singh At North Chakmir Sardar Para. ( Length- 100 Mtr)
₹2,26,638
Sanctioned
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Construction of Surface Drain From House of Samser Molla To House of Billal Hossen at Ganipur. (Length- 50 mtr)
₹2,00,200
Ongoing
Recommended 23 May 2025 · sanctioned 24 Jun 2025
Installation of 9.0 mtr high mast light post near Nungi Gumo Sau para Durga mandir.
₹3,10,193
Ongoing
Recommended 23 May 2025 · sanctioned 9 Sept 2025
Renovation work of Moulana Abul Kalam Azad Primary School at Ward No. 14 under Pujali Municipality.
₹1,50,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Renovation work of Najrul Bidyaniketan at Ward No. 02, under Pujali Municipality.
₹4,00,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Renovation work of Pashchim Pujali F. P. School at Ward No. 04 under Pujali Municipality.
₹7,00,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Renovation work of Pujali F.P. School at Ward no. 09 under Pujali Municipality.
₹6,00,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Renovation work of Pujali Sikshaniketan High School at Ward no. 01, under Pujali Municipality.
₹5,00,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Renovation work of Rajarampur F.P. School at Ward No. 13 under Pujali Municipality.
₹1,50,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Repairing of Burial Ground at Ward No. 15 under Pujali Municipality.
₹5,00,000
Sanctioned
Recommended 23 May 2025 · sanctioned 25 Feb 2026
Beutification of Bagirhat Children Park.
₹12,00,000
Sanctioned
Recommended 21 May 2025 · sanctioned 10 Nov 2025
Construction of CC Road and drain with cover slab from House of Raja Laskar to House of Lalu Laskar via House of Bobby at Uttar Panchur Jora Pukur. (Length- 66.0 Mtr.)
₹2,56,995
Ongoing
Recommended 21 May 2025 · sanctioned 9 Sept 2025
Construction of CC Road from House of Bablu to House of Iqbal at Mohammadi Basti. (Length- 70 Mtr)
₹2,57,000
Sanctioned
Recommended 21 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from House of Lutu to House of Moina, at Panchur Laskarpara. (Length- 90 Mtr)
₹2,40,000
Sanctioned
Recommended 21 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road from House of Akramul Mallick to House of Atibar Mallick at Rameswarpur. (Length- 30.0 Mtr)
₹2,50,000
Sanctioned
Recommended 21 May 2025 · sanctioned 25 Feb 2026
Construction of CC Road from House of Amit Sengupta to House of Raju Datta at Santinagar Ujjal Sangha. (Length- 65 Mtr.)
₹2,57,000
Ongoing
Recommended 21 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from House of Dilip Das to House of Pappu Saha, at Panchur Laskarpara. (Length- 100 Mtr)
₹2,60,000
Ongoing
Recommended 21 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from House of Paromita to House of Arup via House of Santi at Ramdashati Bajar. (Length- 60 Mtr)
₹2,57,000
Ongoing
Recommended 21 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road from Kalagachia Main Road to House of Sariyat Pailan via House of Mahim Pailan. (Length- 61 Mtr)
₹2,50,000
Sanctioned
Recommended 21 May 2025 · sanctioned 8 Sept 2025
Construction of CC Road from Kanyanagar Colony ND Road towards House of Ghanashyam Nandy. (Length- 24 Mtr)
₹1,00,000
Sanctioned
Recommended 21 May 2025 · sanctioned 8 Aug 2025
Construction of CC Road from Nayabasti Masjid to House of Noor Islam, at Akra Fatak. (Length- 100 Mtr)
₹2,60,000
Sanctioned
Recommended 21 May 2025 · sanctioned 1 Aug 2025
Construction of CC Road from Rasapunja Main Road to House of Farid Tarafdar. (Length- 92.0 Mtr)
₹2,50,000
Sanctioned
Recommended 21 May 2025 · sanctioned 25 Feb 2026
Construction of CC Road from T.M. Lane Main Road to House of Kohinoor Bibi via House of Raju at Ward No. 4 (Length- 70.0 Mtr.)
₹2,56,966
Ongoing
Recommended 21 May 2025 · sanctioned 21 Aug 2025
Construction of CC Road with Drain from House of Gautam Mondal to House of Sanatan Naskar at Shiw Tala Alampur. (Length- 45 Mtr.)
₹2,57,000
Ongoing
Recommended 21 May 2025 · sanctioned 24 Jun 2025
Construction of CC Road with Pilling from House of Kudrat Sk to House of Mobabul Sk at Harindanga Gp (Length-45 Mtr)
₹3,48,285
Ongoing
Recommended 21 May 2025 · sanctioned 23 Jun 2025
Construction of CC Road with Pilling from House of Nadiram Adhikari Via House of Ashok Nath to House of Jaydeb Mondal at Gangadharpur (Length - 60 Mtr.) Under Parulia G.P.
₹2,99,533
Sanctioned
Recommended 21 May 2025 · sanctioned 23 Jun 2025
Construction of CC Road with Protection Wall from Gorapara Kabarstan towards House of Mamtaj Sk at Dudhbeshali. (Length - 37 mtr.)
₹2,00,000
Sanctioned
Recommended 21 May 2025 · sanctioned 10 Jul 2025
Construction of CC Road with Protection Wall from House of Binod Naskar towards House of Dipankar Mondal at Gandhabaduli. (Length- 25.0 Mtr.)
₹2,50,000
Sanctioned
Recommended 21 May 2025 · sanctioned 10 Nov 2025
Construction of a Community Toilet at Bakhrahat Bazar
₹3,00,000
Sanctioned
Recommended 17 May 2025 · sanctioned 10 Jul 2025
Construction of CC Road for alleys at Bakhrahat Bazar
₹7,95,000
Sanctioned
Recommended 17 May 2025 · sanctioned 10 Jul 2025
Construction of CC road from House of Ajay Mukherjee to House of Sandip Ray at Raypara ( Length- 55.0 Mtr) within ward-09 under DHM.
₹1,42,984
Ongoing
Recommended 17 May 2025 · sanctioned 19 Jun 2025
Construction of CC road from House of Tarun Haldar to House of Dhananjay das at Shelampur. (Length - 116 mtr. Width - 1.5 mtr.)
₹3,25,000
Sanctioned
Recommended 17 May 2025 · sanctioned 25 Feb 2026
Construction of CC Road with Guardwall from House of Tapas Pramanik to House of Sanjay Gayen . (Length - 41.88 mtr, Width - 2.10 mtr)
₹3,50,000
Sanctioned
Recommended 17 May 2025 · sanctioned 10 Nov 2025
Construction of CC road with pilling from house of Sandip Biswas to house of Biswanath kar and house of Sujoy Chakraborty to house of Milan Chakraborty at Narayani .(Length-104 mtr, Width- 1.75 mtr)
₹3,00,000
Sanctioned
Recommended 17 May 2025 · sanctioned 17 Aug 2026
Construction of Platform with Shed and Proper Drain for fish market at Bakhrahat Bazar
₹7,55,000
Sanctioned
Recommended 17 May 2025 · sanctioned 10 Jul 2025
Installation of Solar Lights from House of Debkumar Maji to House of Sunil Sikder via House of Dilip Samanta and from House of Kalipada Jana to Radha Krishna Sebashram at Borhanpur mouza.
₹3,00,000
Sanctioned
Recommended 17 May 2025 · sanctioned 8 Aug 2025
Construction of CC Road from H/O Gunodhar Maity to H/O Laltu Porey. (125.62 mtr)
₹3,25,777
Completed
Recommended 15 May 2025 · sanctioned 12 Mar 2025 · completed 15 May 2025
Construction of CC Road from H/O Nasir Molla to Land of Ismail Molla at Joktabla. (54.19 mtr.)
₹2,99,995
Completed
Recommended 15 May 2025 · sanctioned 5 Dec 2024 · completed 15 May 2025
Construction of C.C road from H/O Altaf Sepai to H/O Sabina Bibi at Gandhabaduli. (121 mtr)
₹2,03,187
Completed
Recommended 8 May 2025 · sanctioned 21 Nov 2024 · completed 8 May 2025
Construction of CC Road from Shop of Habi Mondal to H/O Moinuddin Mondal. (120 mtr)
₹3,55,999
Completed
Recommended 8 May 2025 · sanctioned 27 Nov 2024 · completed 8 May 2025
Construction of C.C road with Protection Wall from H/O Younus Khan to H/O Hafizul Molla. (24.10 mtr)
₹1,48,064
Completed
Recommended 6 May 2025 · sanctioned 26 Dec 2024 · completed 6 May 2025
Construction of C.C road from H/O Badan Bar to Ghosh Para Culvert. (120 mtr)
₹2,47,885
Completed
Recommended 23 Apr 2025 · sanctioned 21 Nov 2024 · completed 23 Apr 2025
Construction of C.C road from H/O Javed Mallick to H/O Iliyash Molla. (53 mtr)
₹1,10,431
Completed
Recommended 23 Apr 2025 · sanctioned 21 Nov 2024 · completed 23 Apr 2025
Construction of CC Road from H/O Arati Mondal to Subhojit Purukait. (161.57 mtr.)
₹2,99,987
Completed
Recommended 22 Apr 2025 · sanctioned 5 Dec 2024 · completed 22 Apr 2025
Construction of CC Road from H/O Budhyadeb Halder to Land of Ashok Halder. (138.87 mtr)
₹2,82,667
Completed
Recommended 2 Apr 2025 · sanctioned 28 Feb 2025 · completed 2 Apr 2025
Construction of CC Road with Brick Soling from H/O Yudhistir to H/O Amar Singh at Raghunath Nagar. (73.48 mtr.)
₹2,94,024
Completed
Recommended 2 Apr 2025 · sanctioned 5 Dec 2024 · completed 2 Apr 2025
Construction of C.C road from H/O Arjun Sardar to Haribasartala.(79 mtr)
₹1,90,783
Completed
Recommended 12 Mar 2025 · sanctioned 21 Nov 2024 · completed 12 Mar 2025
Construction of CC Road from Uttar Kuleswar Ration Shop to H/O Sahid Ali Mir. (136.06 mtr.)
₹3,48,218
Completed
Recommended 11 Mar 2025 · sanctioned 5 Dec 2024 · completed 11 Mar 2025
Construction of C.C road from 18 No ICDS Centre towards H/O Kalipada Mondal at Uttar Kazirhat. (48 mtr)
₹1,99,362
Completed
Recommended 6 Mar 2025 · sanctioned 21 Nov 2024 · completed 6 Mar 2025
Construction of C.C road from H/O Bimal Santra towards H/O Kayem Molla.(126.5 mtr)
₹3,49,963
Completed
Recommended 6 Mar 2025 · sanctioned 21 Nov 2024 · completed 6 Mar 2025
Construction of C.C road from H/O Bulo Kumar to H/O Naresh Kumar at Hanta. (45 mtr)
₹1,49,876
Completed
Recommended 27 Feb 2025 · sanctioned 21 Nov 2024 · completed 27 Feb 2025
Construction of C.C road from H/O Mantu Mondal near Panarala F.P. School to H/O Manas Mondal. (60 mtr)
₹1,37,255
Completed
Recommended 27 Feb 2025 · sanctioned 21 Nov 2024 · completed 27 Feb 2025
Construction of C.C road from H/O Bablu Mondal to H/O Nantu Purkait.(61 mtr)
₹3,48,342
Completed
Recommended 11 Feb 2025 · sanctioned 21 Nov 2024 · completed 11 Feb 2025
Construction of C.C road from H/O Karim Sardar to H/O Sekendar Kazi. (80 mtr)
₹1,53,261
Completed
Recommended 11 Feb 2025 · sanctioned 21 Nov 2024 · completed 11 Feb 2025
Construction of C.C road from H/O Paritosh Safui to H/O Sarama Safui at Prasadpur.(52 mtr)
₹1,49,044
Completed
Recommended 11 Feb 2025 · sanctioned 21 Nov 2024 · completed 11 Feb 2025
Construction of Concrete Culvert near the H/O Ramprasad Kayal at Kalmikhali.
₹2,93,375
Completed
Recommended 11 Feb 2025 · sanctioned 21 Nov 2024 · completed 11 Feb 2025
Construction of Road with Pilling At Parulia from H/O Debabrata Mondal to Stadium Ground ICDS School Via Parulia F.P. School. (116.68 mtr.)
₹2,99,833
Completed
Recommended 11 Feb 2025 · sanctioned 21 Nov 2024 · completed 11 Feb 2025
Construction of C.C road from Jora Kali Mandir towards H/O Laxman Das at Gotberia. (42 mtr)
₹1,49,635
Completed
Recommended 7 Feb 2025 · sanctioned 21 Nov 2024 · completed 7 Feb 2025
Construction of CC Road at Lokhipur from H/O Mostakin Laskar to H/O Asmaul Laskar via H/O Ansar Laskar & Faruq Gazi. (161.57 mtr.)
₹2,99,997
Completed
Recommended 4 Feb 2025 · sanctioned 21 Nov 2024 · completed 4 Feb 2025
Construction of C.C road from H/O Ayesh Pramanik towards Ghuna Naru's House. (69 mtr)
₹2,35,581
Completed
Recommended 29 Jan 2025 · sanctioned 10 Dec 2024 · completed 29 Jan 2025
Construction of CC Road from H/O Sakim Khan to Bonhogla Sardar Para. (150 mtr)
₹2,50,000
Completed
Recommended 13 Jan 2025 · sanctioned 24 Oct 2024 · completed 13 Jan 2025
Construction of CC Road from H/O Anis Gayen to H/O Uttam Gayen Via H/O Amar Gayen to H/O Bijoy Gayen at Harish Pur. (100 mtr)
₹2,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction Of CC Road from H/O Golam Ali Mollik To H/O Alfaj Sk. (100 mtr)
₹2,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from H/O Gopal Das to H/O Dukhiram Das. (150 mtr)
₹3,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from H/O Hafija Beoya to H/O Naju Molla. (100 mtr)
₹1,99,993
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from H/O Manas Prodhan to H/O Nepal Jana.(106 mtr)
₹2,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from H/O Pradyut Chowdhury to H/O Arun Chowdhury. (300 mtr)
₹4,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from H/O Rafik Sekh to H/O Khalek Sekh. (45 mtr)
₹1,49,859
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from H/O Ramprasad Kunti to H/O Kalipada Kunti. (115 mtr)
₹2,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction Of CC Road from H/O Shekhar Baidya To H/O Sandha Biswas. (200 mtr)
₹3,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from Mukta Kanta Club to Rail Line Kali Temple.(150 mtr)
₹3,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction Of CC Road from Rakhakalitala (Bindupara) to H/O Sanat Bindu Via H/O Arun Bindu. (120 mtr)
₹2,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from Sri Krishna Builders to H/O Bimal Mukherjee. (135 mtr)
₹2,50,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road from the H/O Ganesh Parui To H/O Sudip Parui Via H/O Panchu Parui At Kantaria. (100 mtr)
₹2,00,000
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Road with Brick Soling from Saifuddin Molla's Shop to Ajijul's Shop,at Mulpunja. (300 mtr)
₹3,99,987
Completed
Recommended 26 Dec 2024 · sanctioned 24 Oct 2024 · completed 26 Dec 2024
Construction of CC Drain from H/O Latika Mondal to Shamalesh Halder's land Via H/O Sanat Haldar. (120 mtr)
₹1,99,993
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road from H/O Bapan Naskar to H/O Souvik Naskar. (100 mtr)
₹2,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction Of CC Road from H/O Dilip Mal to H/O Kanai Mal. (75 mtr)
₹1,50,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road from H/O Hamanto Dalui to H/O Madhai Khamaru.(100 mtr)
₹2,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road from H/O Monirul Sk to H/O liyakat Sipai. (120 mtr)
₹2,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road from H/O Pratap Shee to H/O Sanjoy Shee. (150 mtr)
₹2,99,999
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road with Brick Soling from H/O Ashis Sardar to H/O Kachari Sardar. (120 mtr)
₹2,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road with Brick Soling from Daluipur Khalpar to H/O Dipak Mondal via Pachanantala at Daluipur. (150 mtr)
₹3,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road with Brick Soling from H/O Suvendu Mondal to H/O Pintu Halder. (105 mtr)
₹2,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road with Brick Soling from H/O Swapan Natuya to H/O Samiya Sk. (150 mtr)
₹2,99,999
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road with Brick Soling from Mudi dokan of Sabir Sk to H/O Jantu Sk via H/O Alamin Molla at Gopalpur-I. (150 mtr)
₹3,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road with Brick Soling from Mudidokan of Najrul Sk to Bonmalipur Tea Stall of Abdul Sk at Krishnamadhabpur. (115 mtr)
₹2,00,000
Completed
Recommended 24 Dec 2024 · sanctioned 24 Oct 2024 · completed 24 Dec 2024
Construction of CC Road from Sargoria Pole To Netaji Stachu. (400 mtr)
₹4,99,982
Completed
Recommended 19 Dec 2024 · sanctioned 24 Oct 2024 · completed 19 Dec 2024
Ambulance is required for the Gulzarbagh Nizamnagar surrounding area.
₹9,00,000
Ongoing
Recommended 5 Sept 2024 · sanctioned 25 Sept 2025
Construction of CC Road from H/O Arun Shaw to H/O Sarvan Shaw via Shankar Dhanuk Gally, T.G Road. (215 mtr)
₹4,99,946
Ongoing
Recommended 5 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from H/O Mojammal to H/O Hakim Molla via H/O Kalam to H/O Sekh Hablu at Haldar Para. (120 mtr)
₹4,99,989
Ongoing
Recommended 5 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from H/O Raju Mahato to H/O Sanjib Bachhar at Natun Pole. (311.45 mtr)
₹4,99,939
Ongoing
Recommended 5 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from H/O Ranadeb Mitra to H/O Shankar Dutta at Kalinagar. (187 mtr)
₹5,99,965
Ongoing
Recommended 5 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from Loknath Medical Hall to H/O Chandan Ghosh at Bidhangarh. (150 mtr)
₹4,99,937
Ongoing
Recommended 5 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road with Cover Drain from Lotus Club to H/O SK Najrul via H/O Sk Bhola. (177 mtr)
₹4,99,943
Ongoing
Recommended 5 Sept 2024 · sanctioned 9 Dec 2024
Building Repairing works of Rajibpur High School (H.S)
₹14,98,000
Sanctioned
Recommended 4 Sept 2024 · sanctioned 2 May 2025
Renovation of Two Storied Budge Budge Public Library Hall
₹15,00,000
Ongoing
Recommended 4 Sept 2024 · sanctioned 24 Dec 2024
Construction of CC Cover Slab Drain from H/O Sintu Sadhukhan to Mahadevpur Khal At Sadhukhan Para. (90 mtr)
₹2,99,987
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC New Drain at 3No Pole From H/O Manoshi Mukharjee to H/O Raja Tamang and H/O Birendro Shaw. (50 mtr)
₹1,19,975
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road & Slab from H/O Jahangir Thander to H/O Anisur Purkait at Thander Para. (126 mtr)
₹2,99,999
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road at Doulatpur Transfer Road from H/O Rinku Das to H/O Sahadeb Mondal. (100 mtr)
₹3,49,913
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road From H/O Saud Molla to H/O Miraj Molla at Laskar Para. (59.9 mtr)
₹99,926
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road From Bablu's Tea Stall to H/O Dilip Das. (45 mtr)
₹1,99,944
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road from Dr. Ashish Bhuiya's Medical Clinic to H/O Swapan Mishra. (80 mtr)
₹1,99,960
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from Durga Mandir to Tufan Ice Creamr (293 mtr)
₹9,99,574
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road From H/O Akash Nandi to H/O Uttam Halder. (70 mtr)
₹2,99,974
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road from H/O Apu Deb to H/O Ramen Sarkel. (75.40 mtr)
₹2,99,675
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from H/O Debashish to H/O Swapon & Vombol's shop to H/O Bimol Halder and H/O Bishonath Mondal to H/O Uttom Mondal (127 mtr)
₹2,99,994
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from H/O Pradip Mukherjee to H/O Ashok Dutta.(155 mtr)
₹3,49,746
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road from Jagroto Sangha to H/O Asokh Gayen and Pintu Naskar to Bapi Pandey and Ajoy Mistry to Khokon Mistry and Haran Naskar to H/O Horen Naskar. (211 mtr)
₹2,99,985
Ongoing
Recommended 3 Sept 2024 · sanctioned 30 Jan 2025
Construction of CC Road From Taltala Colony Sitala Kali Mandir towards Khal Par Soni Mondir. (90 mtr)
₹2,99,889
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road From V.K.Pally H/O Swapan Dey To H/O Sanjib Kar.(100 mtr)
₹3,00,000
Ongoing
Recommended 3 Sept 2024 · sanctioned 28 Nov 2024
Construction of CC Road With Drain With Cover Slab from H/O Azadul to H/O Tuttun Khan at Boganoa Para. (98.3 mtr)
₹1,99,947
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road With Guardwall - Both Side Natunhat Bamonpara Road to H/O Delip Gharami. (25 mtr)
₹1,99,986
Ongoing
Recommended 3 Sept 2024 · sanctioned 9 Dec 2024
Construction of CC Road from H/O Jaydeb Sardar to H/O Asim Sau. (95 mtr)
₹3,50,000
Sanctioned
Recommended 2 Sept 2024 · sanctioned 27 Nov 2024